

Add to Cart
Processing parts of injection molding abrasive tools
Specifications
1. OEM and ODM
2. High quality and precision.
3. Competitive price.
4. Mass production capacity.
5. The delivery time is short.
6. Optional materials: PP PA PVC PVD ABS, etc.
8. Customized specifications 9. LOGO can be customized.
9. Processing type: metal stamping bending parts, metal stamping
drawing parts, metal stamping parts.
10. Sample: stamping manual sample can be used to reduce cost.
Description:
We support custom CNC machined parts for most materials
(Non standard parts)
The quotation is based on your drawings (size, material, thickness,
processing content and required technology, etc.)
Tolerance+/-0.005-0.01mm (customizable)
Surface roughness Ra0.2-Ra3.2 (available for customization)
Available materials, such as PE, PVC, ABS, etc.
Surface treatment such as polishing, general oxidation, hard
oxidation, color oxidation, surface chamfering, tempering,
quenching, etc.
Machining CNC turning, milling, turning milling compound, drilling,
automatic lathe, tapping, bushing, surface treatment, etc.
Specification:
Material | ABS PP |
Application | Widely used |
Color | red |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ:
Q1: What is the standard length of your profile?
A: The standard length of the profile is 6020mm, and we can cut it
into a specific length to meet your project needs.
Q2: What is your minimum order quantity?
A: We do not have the minimum order quantity for new customers. We
accept small orders to support your trial orders, new designs and
market development.
Q3: Can you provide free samples?
A: Yes, we can provide free samples, but if you do not have an
international express account, we would prefer to charge the
freight.
Q4: What is the delivery date for small orders and mass production?
A: Small orders take 1~3 working days, and mass production of
materials takes 3~15 working days. The final delivery date shall be
subject to each invoice.