Product Details
Rubber vacuum casting service small batch Medical equipment rapid
prototype
Steps of silicone mold
1. Prototype: before making silicone mold, we need to make
prototype. The prototype can be made of common ABS material and
processed by CNC.
2. After the prototype of the silicone mold is ready, start making
the silicone mold. Eight hours after drying, the silicone die cut
open, take out the prototype. At this point, the silicone mold is
ready.
3. Injection molding: inject the liquid gum material into the
silica gel mold and dry it. The service life of silicone mold is
about 25 mold times.
Advantage
Time is fast, cost is less, processing failure probability is
small, etc. More than 20 same products can be made with a silicone
mold. The cost, cycle and risk of product development are greatly
reduced.
Technical Datas
Item Name: | playmobile rapid prototype |
payment | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Paypal,payoneer |
The industry we serve: | Auto parts, medical appliance, consumer electronics etc. |
Main customers : | Siemens, General Motors Group, Huawei,Foxconn, Gree, Haier, TCL,
Dongfeng Motor, SAIC Volkswagen etc. |
The Service we provide for CNC prototype and rapid prototype: | 1. Rapid prototyping making(SLA,SLS,FDM) |
2. CNC prototype manufacturing |
3. Rapid silicone mould and vacuum casting |
4. Aluminum parts machining |
5. Reverse Engineering |
6. Injection molding |
7. Reaction Injection Molding(RIM) |
Available Materials: | ABS,POM,PP, PU,PC,PA66,PMMA,PVC,PVE, Aluminum ,Brass,Iron etc. |
Surface processing: | Injector, light color, dumb color, rubber oil, transparent color,
translucent colors, transparent pearlescent color. |
So please just send us 3D files (in .IGS/ .X-T/.PRT/.STP/.STL
format ) of your project, tell us your special requirement, then we
will soon practise your idea to truth.darrow is looking forward to
hearing from you . |
Pictures
Company Profile

Our company was founded in 2007, with a mature management, research
and development, production and manufacturing team, has 14 years of
product production and development experience, to provide
enterprise customers with the best quality services and innovative
products, to create a craftsman spirit as the product vitality of
the continuous brand.The factory is located in jintan district of
changzhou city. The factory covers an area of more than 3,000
square meters.With the establishment of jintan division, the
company's production capacity will be greatly improved on the basis
of the existing production capacity in kunshan city, effectively
shortening the customer response time and improving customer
satisfaction.In order to serve customers better and faster, the
company will continue to expand capacity according to market demand
changes in the future.The company will continue to uphold the
quality, ingenuity, management, service philosophy, committed to
the continuous development of the industry leader.