Home /Tool Processing Services /

Passivation Worm Gear Machining Al6082 Aluminum Cnc Milling Parts

Passivation Worm Gear Machining Al6082 Aluminum Cnc Milling Parts

Brand Name:BeiJi
Model Number:BeiJi
Minimum Order Quantity:100 pieces
Delivery Time:3-4 weeks
Payment Terms:L/C, D/A, D/P, T/T,
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: 198 Tianjian East Road, Jiadu District, Chengdu City, Sichuan Province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

CNC Machining Parts Precision Worm Gear Stamping Parts


Company industry information

We operate 2 axis CNC Lathe, 4 axis CNC Mills, and do manual turning and milling. We also offer OD Grinding, Stick, MIG and TIG welding. Sawing, Flame and Plasma cutting. Assembly, packaging, and shipping. We use modern CAD and CAM software and can utilize all popular electronic file formats.


Specifications

Material1.Stainless Steel:AISI303, AISI304, AISI316F, 420,440,etc.
2.Aluminum: Al6061, Al6063, Al7075, Al6082,etc.
3.Brass:C36000, C37700, Hpb59-1, H62, C27200(CuZn37),etc.
4.Steel: carbon steel, alloy steel, etc.
5.Copper

ProcessingCNC turning, milling, drilling, grinding, wire EDM cutting etc.
Surface treatmentSand blasting, polishing, Anodize, zinc/nickel/chrome/ plating,Power coating, passivation,Heat treatment, etc.
Tolerance±0.005mm, 100% QC quality inspection before delivery, can provide quality inspection form
Testing equipmentCMM,Tool microscope,Automatic height gauge,Dial gauge,YVM 2.5D,rough meter


Tolerance of tolerance


There is not a given set of tolerances that fits all processes and materials. In every case, the final tolerances on your part will depend on a number of factors, including but not limited to:

●Part size

●Design geometry

●The number, type, and size of features

●Material(s)

●Surface finish

●Manufacturing process


Once your order is confirmed, we will review your design and provide a design for manufacturing review, pointing out any areas where we may not be able to achieve your desired tolerances. It’s helpful if you can specify which areas in your design have critical tolerances that must be met and which can be slightly modified if needed to reduce the time and costs involved.


All manufacturing and technical specifications need to be clearly specified in the 2D drawings in order to be followed.


Packaging Details


Plastic molds packing methods:

1-Surface coated with anticorrosive paint

2-Wrapped with PE film

3-Fixed and sealed by wooden boxes



FAQ

1: What is your terms of payment?
a).Usually,we accept T/T ,Pay Pal, West Union.For regular orders,we prefer 30% in advance,70% against the of B/L.For long term business relations, we have more advantage terms for payment.

2: What is your terms of delivery?
a).We accept FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.

3: What is the lead time?
a).It usually takes 15 to 20 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
4: How about the transportation?
a): You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.

China Passivation Worm Gear Machining Al6082 Aluminum Cnc Milling Parts supplier

Passivation Worm Gear Machining Al6082 Aluminum Cnc Milling Parts

Inquiry Cart 0