1.2343 / 28 Teeth Rotation Sleeve Mould Parts Fittings For Bottle Cap Packaging

Brand Name:SENLAN
Certification:ISO9001
Minimum Order Quantity:1pcs
Delivery Time:5-20working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: NO.27,ShangLang Road,XiaBian District,Chang'an town, Dongguan China
Supplier`s last login times: within 27 hours
Product Details Company Profile
Product Details

Customized 1.2343/ 28 Teeth Rotation Sleeve Mould Parts Fittings for Bottle Cap Packaging


The Description Of Sleeve Mould Parts


Sleeve inserts are part of molding, which is manufactured separately from the mold. Position it in the mold to obtain shapes in the casting that cannot be obtained correctly with the mold. It is part of the packaging mold accessories, which belong to the bottle mold accessories.


Specification:

Shaping ModeCNC/Milling/+Grinding
Product MaterialHigh Speed Steel
HardnessHRC58-64
Tolerance+/-0.005
Surface FinishingPolished
CoatingTiN/TiCN/ALTiN
Brand NameSenlan
Delivery timeStocks Now (Or 7-8 Days)
MOQ1 pcs
Port of loadingDongguan
PaymentT.T Western Union, Paypal

Applications:


1. Cosmetics

2. Daily Packaging

3. Medical

4. Consumption


Packing&Delivery:


1. About Packing:


20 pcs pack in a plastic box, outer pack with carton


2. About Shipment :


DHL, TNT, UPS, Fedex, by air, by sea ect


3. About Lead Time:


Product in stock 1-2 days, products out of stock 3-7 days upon receipt of the payment.


4. About Payment:


Trade Assurance ,T/T , Paypal, Union Western, L/C ect


Our Service:


1. Shipping with Material report & heat treatment report

2. Shipping with QC report

3. Any time welcome to visit our factory

4. Sample is free, without MOQ


Purchase Core Pins Process Chart:


Plastic Mold (Moulds) Components

Production Process

Description
1. 3d Design/Samples For QuotationAccording to 3D drawing or samples for quotation
2. Negotiations

Including the price of mold components

for cores & cavities, weight of product, payment, lifetime, delivery, etc.

3. Purchasing OrderAfter the customer confirming the mould design and quotation
4. Making mold(moulds) components

Confirm drawing, start to do DFM, mold flows and mold detail agreed

with the customer, start production

5. Production scheduleEvery week we will feedback to the customer a mold progress (picture)
6. Sample Shoot

We provide the moulds Components test samples for confirmation (about 1-2piece), then,

get your signature sample, mass production

7. PackageCartons box for parts, or as your requiretment
8. DeliveryDeliver goods by air or by sea. Express

FAQ:


Q1: Could I Have Prices Of Your Products?
A: Welcome. Pls feel free to send us an email here. you will get our reply in 24 hours


Q2: Can We Print Our Logo/Website/Company Name On Products?
A: Yes, please advise the information of the logo


Q3: What's The Lead Time For Regular Order?
A: We have stocks about many standard mold components, about 10 workdays for regular order


Q4: Can I Get A Discount?
A: Yes, please contact us to get the best price


Q5: Do You Inspect The Finished Products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping



China 1.2343 / 28 Teeth Rotation Sleeve Mould Parts Fittings For Bottle Cap Packaging supplier

1.2343 / 28 Teeth Rotation Sleeve Mould Parts Fittings For Bottle Cap Packaging

Inquiry Cart 0