Product Details
Semi-automatic Slotting Corrugated Carton Box Stitching Machine
Machine features:
1 One minute quick order change.The whole machine adopt full
electrical control,easy to operate, no training.
2 Single, double, supplement stitching are available.
3 Stitching pitch is 20-160mm, automatic caculate stitching pitch;
servo motor from Taiwan to control stitching pitch.
4 Touch screen adopt Taiwan Eview brand, 5.7 inch high definition
colorful display touch screen.
5 The latter department automatic counter, can design as 1-99, easy
to binding.
6 Head and fork material main is exported alloy steel, made through
special heat treatment process.
7 The max unfolded single sheet width is 4m, min is 1m.
8 Stitching whatever the carton have cover or not, the first stitch
pitch is 20mm.
9 Adopt Germany timing belt to send the paperboard, can avoid the
price scissors. Adjust feeding paperboard timing belt electrically,
adjust head size electriclly to fasten change order speed.
10 Working table up and down automaticlly.
Technology:
| max working size (length+width)x2 | 2460mm |
| min working size (length+width)x2 | 606mm |
| max working size (width+height)x2 | 1515mm |
| min working size (width+height)x2 | 300mm |
| height of table | 900mm |
| speed | 400nails/min |
| power | 4kw |
| machine size | 2.8x2.6x1.7m |
| machine weight | 2000kg |
| stitching pitch | 30-100mm |
Package:
The normal package is plastic film(Size: L*W*H). If export to
european countries,the wooden box will be fumigated.If container is
too tigher,we will use pe film for packing or pack it according to
customers special request.
pictures:
Company Profile
Cangzhou Zhaoli Import & Export Trade Co.,Ltd. is a new type
company which consisted of import & export sales department and two
machine manufacture factories . Specializing in the production of
two series of products, the one type of main products are " carton
forming slotting machine, carton printing slotting machine,
automatic multi knives slitting machine, automatic partition board
assembler machine, automatic partition board machine" etc. for
small carton packing ; the other type of main products are like the
tranditional carton machines , like flexo printer slotter die
cutter machine , folder gluer mahine , laminator machine ,
corrugated cardboard production line etc. At present, our products
not only sale in the domestic but also sale to Europe Union, Middle
East, South-east Asia, Russia, South Africa and other countries and
areas.
Cangzhou Zhaoli Carton Machinery Co,Ltd. was established from
research and development for the corrugated carton printing machine
to current " carton specializing machines serious and automatic
partition board assembler machine serious " , it gives full play to
every technologies on the advancement and manufacturing on the
reliability, thus we can keep the leading position in the field of
corrugated carton making machinery. All of our machines adopt
advanced laser cutting technique in processing center to finish
every structure units, our machines can use our unique technology
to realize even if the cartons are difficult to make.
Our company will do our best to meet customer's requirements, and
bring abundant retribution to new and old customers with new
innovation, development and perfect after-sale service.