Plastic Injection Molding Molds / Custom Rapid Prototyping Plastic Parts

Brand Name:RJC
Certification:ISO9001:2015&2008,D277435, 13485
Minimum Order Quantity:Negotiable1 piece
Delivery Time:25-35days
Payment Terms:D/A, L/C, D/P, T/T, D/P
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: 3rdFloor ,3Building, Beifang Yongfa Sci. &Tech Park, XinerZhuangCun 2Rd Shajing Town, Bao'an District Shenzhen city,Guangdong,China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Professional Custom Rapid Prototyping Plastic Parts with Top Quality Injection Molding Molds


PRODUCT DESCRIPTION


Basic information:

BrandMoldie
Mold BaseLKM, HASCO, DME or your requirement
Mold Material45#, P20, H13, 718, 1.2344, 1.2738 and so on
StandardHASCO, DME, MISUMI, PUNCH and so on
Product MaterialPC/ABS, ABS, PC, PVC, PA66, POM or other you want
RunnerCold/Hot Runner
Gate TypeSide gate, Sub gate, Pin point gate, Edge gate etc
Mould Weight50kg-15Ton
Injection Machine Type80-1500Ton
Standard for Product Appearance for grainingMT(Mold Tech), YS, HN Series
The Way of Color Contrast for PlasticRAL PANTONE
CertificatedISO 9001:2015 Certificated, SGS Certificated

Plastic Mold (Mould) production process:


1. 3D drawing/Samples for quotation: According to 3D drawing or samples for quotation.


2. Negotiations: Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, product color, payment, moulds lifetime, delivery, etc.


3. Purchasing Order : After the customer confirming the mould design and quotation.


4. Making mold(moulds): Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start producion.


5. Production schedule: Every week we will feedback to the customer about the mold progress(picture).


6. Sample shoot: We provide the moulds test samples for confirmation(about 10-15 piece), we will start mass production when get your signature samples.


Q: Does your company belong to a manufacturing company or a trading company?
A: We are industrial component manufacturing company.

Q: What is your company's R / D ability?
A: We have a 10-persons
R&D department responding for the design of a mold or production technology for the customer for screws,turning, stamping, and plastic injection products


Q: What is the quality control of your company?
A: Our company has the system certification of ISO9001 and IATF16949. We have special product laboratory and measurement room, and have very professional testing & measuring equipment. We do raw material incoming inspection, in-process product quality control and outgoing goods quality control.

Q: How long will the quotation be completed normally in your company?
A: According to different products, consider whether the common materials used and how the processing precision, and in general,the quotation will be completed in 1-2 days.

Q: What is lead time for goods delivery normally?
A: Depends on different product type, the delivery lead time will be 5 to 15 days normally after PO confirmed.

China Plastic Injection Molding Molds / Custom Rapid Prototyping Plastic Parts supplier

Plastic Injection Molding Molds / Custom Rapid Prototyping Plastic Parts

Inquiry Cart 0