S50C/P20/1.2311 injection plactic mold base
Mould making steps:
1. Samples/Drawing &Requirement from you
2. Mould design:we will Communicate and Exchange the opinion with
you after you place order.
3. Material Purchase:Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould : following and controlling the tooling
processing.
6. Mould testing:We will inform you the date.
Than will send the sample's inspection report&injection
parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.
TOLERANCES FOR STANDARD MOULD PLATES
Top Clamping Plate(Side Gate System) | AB Plate | Stripper Plate (Side Gate System) | Support Plate | Bottom Clamping Plate(Pin point Gate System) | Top Clamping Plate(Pin point Gate System) | Stripper Plate (Pin point Gate System) | Stripper Plate | Ejector Retainer Plate & Ejector Plate | Spacer Block | |
Thickness | +0.5~0 | +0.4~+0.1 | ||||||||
Width | +0~-0.2 | +1.0~0 | +0.5~0 | -1.5~+0.5 | ||||||
Length | +0~-0.2 | +1.0~0 | +0~0.2 | |||||||
Perpendicularity | 0.05/300 | Datum corners:0.01/100 | 0.05/300 | Datum corners:0.01/100 | 0.05/300 | 0.1/300 | ||||
Datum corners:0.05/300 | Datum corners:0.05/300 | |||||||||
Parallelism | 0.01/100 | |||||||||
Chamfer(Plate width: 150-270mm) | C1.5~C2.0 | |||||||||
Chamfer(Plate width≥300mm) | C2.0~C3.0 |
Q. How long is the lead time for mold?
A : It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.
Q. Before shipment, how to make sure the products quality?
A : We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.
Q. How could I pay them?
A : T/T, L/C are acceptable.
Q. Can I get discounts?
A : Yes, for big order, old customer and frequent customers, we give reasonable discounts.
Q. Which Shipment way is available?
A : By sea to your nearest port.
By air to your nearest airport.
By express (DHL, UPS, FEDEX, TNT, EMS) to your door.