100KVA Dry Type Three Phase Electric Transformer Step Up Step Down 380V 240V

Brand Name:WINLEY
Certification:ISO,CE
Model Number:SG-100KVA
Minimum Order Quantity:1unit
Delivery Time:10-15days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Xiamen Fujian China
Address: No.168,Xiabao Road,Siming,Xiamen,Fujian,China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

Dry Type Transformer 380V 240V 100KVA 3 Phase Transformer Step Up Step Down Electric Transformer


Summarization


Compared with other voltage stabilizers, it has the advantage of large capacity, high efficiency, no wave distortion, stable voltage adjustment, suitability for kinds of loads, bearing instantaneous overload, working continually for long time, as well as free transferring between manual control and automatic control, etc, besides, the three phase voltage stabilizer is provided with protection against over-voltage, over current, phase failure and protection for phase sequence and has following merits: small volume, light weight, convenient installation and reliable running and so on.

Feature

​Silicon Steel Sheet

Cold-rolled silicon steel sheethas excellent magnetic permeability

Copper Coil

Full copper coil is more

efficient and durable

Mounting Bracket

Strong mounting bracket


Specification:


PhaseThree phase
Capacity0.5KVA-2000KVA
Input voltage380V .660V.440V.220V or Customized
Output voltage220V.1140V.690V.660V.440V. 415V.400V.380V .220V.200V.110V or Customized
Output voltage accuracy±1%
Voltage change rate≤1.5%
Output waveform distortionNo distortion (compared to the input waveform)
Insulation classClass F, Class H; IP 00, IP20 etc.
Working efficiency≥98%
Applicable frequency50/60Hz
Connection methodY/D or customized
Overload capabilityMore than 1.2 times of the rated load to work for 4 hours
Sound level≤50dB(within 1m)
Temperature rise≤60
Insulation resistance≥150MΩ
Service life30Years
Working environmentTemperature: -20~+45, Humidity: ≤95% RH no condense
Installation environmentNon-corrosive gas and conductive dust
StandardVDE0550, IEC439, JB5555, GB226
Cooling methodAN/AF

Production process




FAQ


1. Q: Can I have a sample order?

A: Yes, we welcome sample order to test and check quality.

2. Q: What is the lead time?

A: Sample time 3-7 days, we usually ship by DHL, UPS, FedEx,etc. Mass production time 7-25 days.

3. Q: How long is the warranty?

A: 24 monthes from B/L. If there are any accessory problems,just provide the photos of damaged accessory,then we will provide free service. According to the number of products,we will provide easily damaged accessories for free. we also can provide technical support if you need.

4. Q: Is OEM/ODM available?

A: Yes,it is! We are manufacturer with our own R&D team, we can customize products according to customer's drawing or requirements.

Customized services:

a. Customized color and special function.

b. Customized box.

c. Print customer's logo(MOQ:≥10pcs).

d. Your other ideas about product, we can help you design and put them into production. The above customized services must be confirmed before production.

5. Q: How to control the products quality?

A: Our company owns the core technology ,all kinds of products hold CE certificate. We have professional engineers. Workers are strictly required to make products according to the drawings. Each process has technical instructors.The QC supervisors will regularly inspect the production. We will do products performance tests during production, and comprehensive quality tests when the products is completed.

China 100KVA Dry Type Three Phase Electric Transformer Step Up Step Down 380V 240V supplier

100KVA Dry Type Three Phase Electric Transformer Step Up Step Down 380V 240V

Inquiry Cart 0