Left Or Right Window And Door Handle Powder Coated Zinc Aluminium Meterial ODM

Brand Name:HANZSON
Minimum Order Quantity:500 pcs
Delivery Time:30 work days
Payment Terms:T/T, L/C
Place of Origin:Foshan, China
Price:USD 1.587 - 1.904 / PC
Contact Now

Add to Cart

Verified Supplier
Location: Foshan China
Address: 8b06, Block C, Zhongying Square, No. 6, Jinmao Avenue, Dali, Nanhai District, Foshan City,China
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Left Or Right Window And Door Handle Multi Point Fork Aluminium Window Handle


Quick Details


Type: Door & Window Handles

Place of Origin: Guangdong, China

Brand Name: HANZSON

Product name: mutil point window handle

Application: Office & Home &Hotel

Package: Plastic Bag+box+carton

MOQ: 500 Pieces

Delivery time: Within 30 Days

Service: OEM ODM

Color: Customized Accepted

Port: Guangzhou Port

Payment terms: EXW

Finish: Powder Coating


Supply Ability


30000 Piece/Pieces per Month


Packaging & Delivery

Packaging Details

1 piece/ box, 40 pieces/ carton


Port

Guangzhou, China


Lead Time:


Quantity(Pieces)1 - 1500>1500
Est. Time(days)10To be negotiated

Product Description


Product Nameleft or right multi point aluminum window handle
MeterialZinc,aluminum
ColorSilver, gray,black,white
Surface finishPowder coated
ApplicationWindow
MOQ1000pcs
Package1 piece/ box, 40 pieces/ carton
OEM/ODmAvailable

FAQ

1) Are you a factory or trading company?

A : We are a factory. We expert in door and window accessories since 1996, enjoy more than 23 years export history.

2) How can I get a sample to check your quality?

A:After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.

3) How long can I expect to get the sample?

A:After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays.
You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?

A:After you place a order,the production handling time is about 45-60 days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

A:Normally we use shipment to transport the goods.It is about 25-40 days.It also depends on which country and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

7) What is the MOQ ?

MOQ=100 pcs, better price with more quantity.

8) How does your factory do regarding quality control?

A:Quality is priority. our workers always attach great importance to quality control from the very beginning to the very end. each products will be inspected before packing.


China Left Or Right Window And Door Handle Powder Coated Zinc Aluminium Meterial ODM supplier

Left Or Right Window And Door Handle Powder Coated Zinc Aluminium Meterial ODM

Inquiry Cart 0