

Add to Cart
PE100 Hdpe Water Supply Pipe And Sewage Pipe For Rural Sewage Reconstruction
----------------------------------------
Basic Info.
HDPE is a very common material, that is, high-density polyethylene. HDPE is high-density polyethylene, and PE is polyethylene. That's the difference. But the physical properties are different.
Outer Diameter DN (mm) | SDR 9 PN20 | SDR 11 PN16 | SDR 13.6 PN12.5 | SDR 17 PN10 | SDR21 PN8 | SDR26 PN6 | Packing Loaded into 40GP/Piece 6m or 12m per Piece |
Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | Wall Thick Ness(mm) | ||
75 | 8.4 | 6.8 | 5.6 | 4.5 | 1085 | ||
90 | 10.1 | 8.2 | 6.7 | 5.4 | 4.3 | 754 | |
110 | 12.3 | 10 | 8.1 | 6.6 | 5.3 | 4.2 | 504 |
125 | 14 | 11.4 | 9.2 | 7.4 | 6 | 4.8 | 378 |
140 | 15.7 | 12.7 | 10.3 | 8.3 | 6.7 | 5.4 | 304 |
160 | 17.9 | 14.6 | 11.8 | 9.5 | 7.7 | 6.2 | 224 |
180 | 20.1 | 16.4 | 13.3 | 10.7 | 8.6 | 6.9 | 182 |
200 | 22.4 | 18.2 | 14.7 | 11.9 | 9.6 | 7.7 | 143 |
225 | 25.2 | 20.5 | 16.6 | 13.4 | 10.8 | 8.6 | 110 |
250 | 27.9 | 22.7 | 18.4 | 14.8 | 11.9 | 9.6 | 90 |
280 | 31.3 | 25.4 | 20.6 | 16.6 | 13.4 | 10.7 | 72 |
315 | 35.2 | 28.6 | 23.2 | 18.7 | 15 | 12.1 | 56 |
355 | 39.7 | 32.2 | 26.1 | 21.1 | 16.9 | 13.6 | 42 |
400 | 44.7 | 36.3 | 29.4 | 23.7 | 19.1 | 15.3 | 30 |
450 | 50.3 | 40.9 | 33.1 | 26.7 | 21.5 | 17.2 | 25 |
500 | 55.8 | 45.4 | 36.8 | 29.7 | 23.9 | 19.1 | 20 |
560 | 62.5 | 50.8 | 41.2 | 33.2 | 26.7 | 21.4 | 16 |
630 | 70.3 | 57.2 | 46.3 | 37.4 | 30 | 24.1 | 12 |
710 | 64.5 | 52.2 | 42.1 | 33.9 | 27.2 | 9 | |
800 | 72.7 | 58.8 | 47.4 | 38.1 | 30.6 | 6 | |
900 | 81.8 | 66.2 | 53.3 | 42.9 | 34.4 | 6 | |
1000 | 90.2 | 72.5 | 59.3 | 47.7 | 38.2 | 4 | |
1200 | 88.2 | 67.9 | 57.2 | 45.9 | |||
1400 | 102.9 | 82.4 | 66.7 | 53.5 | |||
1500 | 110.2 | 88.2 | 71.4 | 57.6 | |||
1600 | 117.6 | 94.1 | 76.2 | 61.2 |
Advantage
1. Reliable connection: HDPE piping systems are connected by hot
melt or electric hot melt, and the strength of the joint is higher
than that of the pipe body, as long as the correct temperature, hot
melt time, cooling time and hot melt connection method are mastered
during construction according to the construction method standard
Generally speaking, there is no risk of leakage during operation.
2. Electrothermal fusion: The use of special electric fusion
welding machine to connect straight pipes and straight pipes,
straight pipes and pipe fittings is generally used for pipes below
160mm.
3. Hot-melt butt connection: It is generally used for pipes above
160mm when using a special butt welding machine to connect pipes.
4. Steel-plastic connection: It can be connected by flange, screw
thread and other methods.
Details
Application
Polyethylene PE water supply pipes are widely used in building
water supply, building drainage, buried drainage pipes, building
heating, gas transmission pipes, welding and telecommunications
maintenance casings, industrial pipes, and agricultural pipes
because of their unique advantages. Wait. Its key applications are
urban water supply, urban gas supply, farmland irrigation and other
industries. PE (polyethylene) raw materials are widely used in the
water supply pipe manufacturing industry because of their high
strength, corrosion resistance, and non-toxic properties; because
it is not easy Rust, therefore, is an ideal pipe to replace
ordinary iron water supply pipes.
Certificate
Company Profile
High Mountain Pipe Management Industry is mainly use HDPE recycled
plastic to develop and produce plastic industrial film. Production
of non-toxic, green, corrosion-resistant, and good performance
MUHDPE alloy pipes, HDPE national standard corrugated pipes, HDPE
national standard corrugated pipes, EPTU three-wall seismic and
impact resistant pipes, HDPE steel belts to increase strength
spiral corrugated pipes, SRWPE plastic steel dimensional winding
pipes , HDPE double wall corrugated pipe, FRPP double wall
reinforced corrugated, HDPE water supply pipe, CPVC cable
protection pipe, PE porous general cable protection pipe, FRP sand
pipe, plastic inspection well and related supporting series
products. Provide research and development for different municipal
construction pipe network projects. Integrated services in
production, sales, installation and engineering skills
FAQ
Q: How can you guarantee the goods you offer is qualified?
A: We always believe honesty and responsibility are basis of one
company, so whatever products we provide for you all are qualified.
We will have goods tested and provide COA before delivery for sure.
Q: How and when can I receive my goods after payment?
A: For small batch products, they will be delivered to you by
international express (DHL, FedEx, TNT, etc.) or by air. It usually
takes 3-5 days to receive the goods after delivery. For high-volume
products, it is worthwhile to see the goods and deliver them. It
takes several days to several weeks to reach the destination port,
depending on the location of the port.
Q: Is the price on this page correct?
A: The listed prices are for reference only, please contact us
directly for the latest prices.