Add to Cart
CNC flame/plasma gas cutting machine can be applied in lot size
steel sheet straight cutting, as well as irregular geometric shape
cutting. The main frame is annealed to remove stress, stable and
anti-weary. The servo motor, reducer, pressure release valve, air
pipe, magnetic valve as well as cutting guns used are all world
famous brand to ensure excellent cutting performance.
Specification:
The cutting machine uses imported AC motor, and driven with
imported bevel gear reducer. With precision gear and rack move, to
ensure stable function. Air cutting speed is adjusted by frequency
transformer. The air source control box on the main engine can
adjust air pressure from every tunnel easily. All the pressure
adjusting valve and main air pipe are original imported. Pipe and
wire on the broadwise cutting gun all use imported supporting
chain, safe and neat.
model | Drive way | two rails' distance (mm) | effective cutting width (mm) | cutting thickness(mm) | cutting speed (mm/min) | max speed (mm/min) | cutting torch vertical route(mm) |
CNCI-3000 | single side | 3000 | 2100 | 6-200 | 100-750 | 6000 | 150 |
CNCI-3500 | single side | 3500 | 2600 | 6000 | 150 | ||
CNCI-4000 | single side | 4000 | 3100 | 12000 | 150 | ||
CNCII-5000 | double sides | 5000 | 4100 | 12000 | 150 | ||
CNCII-6000 | double sides | 6000 | 5100 | 12000 | 150 | ||
CNCII-7000 | double sides | 7000 | 6100 | 12000 | 150 | ||
CNCII-8000 | double sides | 8000 | 7100 | 12000 | 150 | ||
CNCII-9000 | double sides | 9000 | 8100 | 12000 | 150 | ||
CNCII-10000 | double sides | 10000 | 9100 | 12000 | 150 |
Documents with goods:
1, Instructions including map of electricity and gas.
2, Certificate
3, Packing list
4, On site installation drawing for laying foundations.
Equipment quality and after-service commitment:
1. All the products our company produced are compliant to national
and enterprises standard.
2. Our products should meet all the technical requirement and
parameters, and ensure the safe and stable function.
3. We will send workers to the working site of the buyer for
engaging in and instructing the installation and test, until the
equipment is ready for use. We also train the equipment operator
and maintenance staff for user.
4. The equipment guarantee period is one year. During this period,
for the breakdown not caused by mis-operation by user, we will be
responsible for repair and replace.
5. After the guarantee period, our companies will provide
maintenance service and spare parts at low cost.