

Add to Cart
Quick Turn Fr4 Circuit Board Immersion Gold Pcb Prototype Boards 4mil
Quick Turn PCB Boards Black Solder Mask Impedance Control FR4 Material Quick Turn PCB Manufacturer
4L Multilayer Quik turn Black PCB
PCB material: PI +FR4,FR4, Rogers
PCB thickness: 0.2~4.0mm(<0.2 mm,>4 mm needs to review) (Board
thickness ≤ 0.6mm,do not apply for HASL surface)
copper thickness of inner and outer base copper: Min 0.3/0.5oz,Max
3oz, advance 4-6oz
Bow and twist: 0.075%
Min. hole size: 0.15mm(<0.15 mm needs to review)
HDI Min drill hole: 0.08-0.10MM
PCB track/gap: 3mil(0.075mm)
PCB outline: Routing/V-CUT/Punching
Solder mask thickness: standard 15-20um; Advanced: 35um
Min solder mask bridge width: green 4mil,other colour 4.8mil
Solder mask filling holes: 0.1-0.5mm
The color of solder mask: green,matt green,blue,matt
blue,black,matt black,yellow,red,white,etc
PCB silkscreen: White, Black and as your request
Peelable mask thickness: 500-1000um
Oxidation film of OSP: 0.2-0.5um
|
FAQ:
Q1: Could you provide PCB Assembly services and components
sourcing?
A: Yes, we could also provide components sourcing and PCB Assembly
services as well as box build if request.
Q2: Which countries have you worked with?
A:USA, Canada, Italy, Germany, UK, Spain, France, Russia, Iran,
Turkey, Czech Republic,Austria, Australia, Brazil, Japan, India
etc.
Q3: Are my PCB files safe when I submit them to you for
manufacturing?
A: We respect customer's copyright and will never manufacture PCB
for someone else with your files unless we receive written
permission from your side, nor we'll share these files with any
other 3rd parties. And we could sign NDA with client if necessary.
Q4: If we have no PCB file/Gerber file, only have the PCB
sample,can you produce it for me?
A: Yes,we could help you to clone the PCB. Just send the sample PCB
to us, we could clone the PCB design and work out it.
Q5: What is your standard lead time for PCB?
A: Sample/prototype(less than 3sqm):
1-2 Layers: 3 to 5working days (fastest 24hours for quick turn
services)
4-8 Layers: 7~12 working days (fastest 48hours for quick turn
services)
Mass production (less than 200sqm):
1-2 Layers:7 to 12 working days
4-8 Layers:10 to 15 working days