Add to Cart
Oilfield Drilling Mud Separator Solids Control Equipment Hydrocyclone Desander
Hydrocyclone description of Solids Control Equipment:
The desander can be widely applied in the triple-process of the drilling fluid and when it is used efficiently, the desanders can effectively clear the solid-phase granules with diameter of more than 30 microns in the drilling fluid. It is one indispensable device for stabilizing and adjusting the drilling fluid technical parameters, suitable for those drillers as ZJ70, ZJ50 and ZJ40. And it can be used together with the sealed circulatory system of the drilling fluid.
Hydrocyclone Advantage of Solids Control Equipment:
1.Simple structure; light and nimble; no moving part
2.Low maintenance charge; easy to attach and detach; save floor
space; low construction expense
3.Large processing capacity
4.The classification particle size can reach 10μm
Solids Control Equipment Hydrocyclone Datasheet
Specification | Diameter (mm) | Inlet Pressure (MPa) | Capacity (m³) | Cut Size (μm) |
FX25 | 25 | 0.1-0.6 | 0.3-0.1 | 5-20 |
FX50 | 50 | 0.1-0.4 | 2-5 | 5-40 |
FX75 | 75 | 0.1-0.4 | 5-10 | 10-40 |
FX100 | 100 | 0.1-0.3 | 8-20 | 20-50 |
FX150 | 150 | 0.08-0.3 | 14-35 | 20-74 |
FX200 | 200 | 0.06-0.3 | 25-40 | 40-100 |
FX300 | 300 | 0.06-0.2 | 45-90 | 50-150 |
FX350 | 350 | 0.06-0.2 | 70-160 | 50-150 |
FX400 | 400 | 0.06-0.2 | 100-170 | 74-150 |
FX500 | 500 | 0.04-0.2 | 140-240 | 74-200 |
FX610 | 610 | 0.04-0.15 | 200-300 | 74-200 |
FX660 | 660 | 0.04-0.15 | 260-450 | 74-220 |
FX710 | 710 | 0.04-0.15 | 500-900 | 74-350 |
FAQ
1. Who are we?
Topland is an integrated supplier established in 2008. We are a
global group of oilfield supplies with excellent teams in more than
5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC
etc.
2. How can we guarantee quality?
Always a double requirements and drawing checking before the
production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and
natural gas industries. Like Rig Components, Drawworks Spare parts
and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control
Equipment, Drilling and Fishing Tools,Wellhead Control
Equipment,Drilling Accessories, Cementing Equipment and Tools etc.
4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win
Cooperation
4-2. Fast Quote, Competitive price & within shortest lead time
4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.
4-2. Order tracking service
5. How is the packing?
All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.
6. What is your terms of payment?
A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.