Add to Cart
DZ500 BOP Handling System/Hydraulic Hoist
BOP Handling System is designed to meet the requirement of installing and removing BOP stacks. The system adopts full-hydraulic control and can be used for large and medium drilling equipment. The main function of system is to lift and install single BOP or BOP stacks. The system features with explosion-proof, easy operating, good reliability, and safety. Controlled by hydraulic operating box, the two lift devices hung on two guide rails each below the drilling floor can achieve the movement of rise, lowering, move forward and backward synchronously, or move forward and backward asynchronously, rise and lowering with limited separation distance (less than 1m). It is convenient for installing and removing BOP stacks.
Type and Specifications:
1. BOP Handling System mainly consists of left / right lift devices
and hydraulic system.
2. BOP Handling System is powered by hydraulic station for floor
mechanical tools of drilling rig.
3. BOP Handling System is easy to install and dismount. All
hydraulic hoses adopt snap joints as connections. It not only makes
it easy to install and dismount system but also keep inner hoses
clean.
Technical Specifications | |
a. Max. Lift Capacity | 2x250=500kN |
b. Max. Lift Height | 3.2m |
c. Max. Lift Speed | 26.3mm per second |
d. Max. Lowering Speed | 55.8mm per second |
e. Max. Horizontal Moving Speed (Dual Direction) | 12m per minute |
f. Cylinder Bore Diameter | 220mm |
g. Max. W.P. Hydraulic System | 16MPa |
h. Max. Flow Hydraulic System | 120L per minute |
i. Wire Line Diameter | 28mm |
j. Model Wire Line | 6x37 |
k. Pulley Diameter | 419mm |
Spare Parts List:
FAQ
1. Who are we?
Topland is an integrated supplier established in 2008. We are a
global group of oilfield supplies with excellent teams in more than
5 countries. such as UAE, Kuwait, Iran and Saudi Arabia. We cooperated with ADES, ECDE, EDC, SOCAR-AQS, PDL, SAKSON, ONGC etc.
2. How can we guarantee quality?
Always a double requirements and drawing checking before the
production;
Always final Inspection before shipment;
3. What can you buy from us?
Drilling rig equipment and the related spares for the oil and
natural gas industries. Like Rig Components, Drawworks Spare parts
and Mud Pump Spare parts, Hydraulic Disc Brake,Solids Control
Equipment, Drilling and Fishing Tools,Wellhead Control
Equipment,Drilling Accessories, Cementing Equipment and Tools etc.
4. Why should you choose us?
4-1. Professional & Efficient, Customer Focus, Win-win
Cooperation
4-2. Fast Quote, Competitive price & within shortest lead time
4-3. Complete Range of products, like spare parts which are interchangeable with most of the well-known OEM equipment.
4-2. Order tracking service
5. How is the packing?
All the packing will meet the strict export packing requirement, we surely know how important the beautiful and firm packaging to the goods.
6. What is your terms of payment?
A: Generally by T/T, 30% advance payment, the balance 70% payment should be paid before delivery. We support EXW, FOB, FCA, CFR, CIF, CIP, DAP, DDU and DDP INCO Terms.