Product Details
Container Dimensions Data Center , DCIM Modular Data Center
Construction
Power Module1
The power module is a single ISO40HC container with four levels of
power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal
arrangement has been designed to allow the upgrade by installing
additional power
equipment. Multiple Power Modules can be combined to support even
high ICT load.
ICT Module1
Two ICT module designs are available to suit different cabinet
depth. They can be combined in different configurations to meet
various
operation requirements. Expansion is easy just by adding more
modules. Combined with the Power module, there is always a
configuration
that meet your requirement.
General Specifications
| Fire Protection | Type | Automatic fire detection (smoke and heat) with gas suppression system (HFC-227ea) |
Monitoring and Management | Access Control | Electronic lock with IC card reader |
| Monitoring | Video: Infrared IP cameras Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access
control and ventilation |
| HMI | Touch screen |
| Remote Access | Web, App |
| Notification | SMS, email |
| DCIM | OwlEye |
| Structure | Container Dimensions (W x D x H): mm | 12192 x 2438 x 2896 (ISO40HC) |
| Container Weight (Fully Equipped): T | <25 |
| Protection Level | IP552 |
Environmental Conditions | Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Humidity: % | 5 to 95 |
| Altitude: m | ≤4000 (derating start >1000) |
| Corrosion | Class C (500m away from seashore) |
Notes:
1 - Consult 3Tech for customized versions with Tier 3 reliability
level or different ICT design load.
2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.
Company Profile
Manufacturer of world class product with the best value of power
products and Electrical and Mechanical turnkey solution.
- Headquarter in Hong Kong with manufacturing facility in Dongguan
of China and Nigeria
- A strong elite team with best technology know how and experience
of implementation all around the world
- Over 20 years experience and products cover over 70 countries
worldwide
- Form strategic partnership with major global conglomerate and
enterprises
- Holder of various patents and leader of the industry
- Leading Hong Kong companies participating in one belt one road
3Tech Corporate Limited was established in 2002, formerly known as
3Tech (HK) Ltd. in 1998. At the beginning, 3Tech was mainly engaged
in the supply and after-sales service of diesel generating sets in
the Greater China region. Since 2002, we have established a local
E&M engineering team in Hong Kong to participate in E&M
projects of HKSAR Government, public and private organizations.
3Tech has been actively developing its business in overseas
communication industry since 2003, with its own product brand
LionRock and Smart Control and Monitoring System OwlEye.
LionRock products have evolved from diesel generating set products
to communication base station energy solutions, seamlessly
connecting to the burgeoning 5G communication infrastructure. It
extends from energy products to edge computing infrastructure
products.
OwlEye is the foundation platform for the future IoT. The products
are already widely used by different multinational operators around
the world.
Our current power energy solutions provide a full range of power
equipment that is simple, efficient, reliable and capable of
meeting various output capacities for different areas of
construction projects, such as power construction or transportation
construction applications.