

Add to Cart
White Color ABS Injection Mold Mold Tools Side Gate For Plastic
ABS Injection Mold Information:
ABS Injection Mold Material Processing Concerns:
As the water absorption values in the table above show, ABS tends
to absorb moisture. Therefore, it must be fully dried before
processing, which adds time and costs — but failing to remove
moisture can result in molded parts with cloudiness, bubbles, or
surface lines. If your parts require a high gloss, highly
reflective surface, more than nine hours of dry time may be
required.
ABS Injection Mold Viscosity:
Melt temperature is another important processing consideration
because of its relationship with viscosity, a measure of a fluid’s
resistance to flow. If ABS pellets are melted beyond their
plasticizing temperature, viscosity increases and the material
becomes more difficult to mold. This behavior differs from other
amorphous plastics, where viscosity decreases beyond the
plasticization, or processing, temperature.
ABS Injection Mold Temperature Control:
ABS that is overheated is also subject to thermal decomposition,
the heat-induced breakdown of chemical bonds. Brown granules on
injected molded parts mean the molding occurred at excessive
temperatures, which is often caused by old equipment with poor
temperature control. For injected molded ABS parts with higher
gloss, however, higher molding temperature must be maintained
without damaging the material. The temperature of the mold itself
is also higher with ABS than with other commonly used materials.
Product Description
Product Material | PP/PVC/PE/HDPE/TPU/PMMA/TPU/NYLON6/NYLON66 |
Mould material | P20/H718/S136 |
Mould life | 500,000 shots |
Software | CAD/IGS /STEP/STP /PDF |
Package | Wooden case |
Gate type | Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Mould time | 40 days for first time testing sample |
Injection time | 3-5 days after confirmation of the sample |
Shipping time | 18-30 days sea shipment |
Payment terms | 50% advanced payment before mould making, balance after sample confirmed. |
FAQ
1. When can I get the price?
A: We usually quote within 24 hours after we get your inquiry.
2. How long is the lead time for mold?
A: It depends on the mold’s size and complexity. Normally, it nees
about 25-35 days.
3. I don't have 3D drawing, how should I start the new project?
A: You can provide us a sample, we will make 3D drawing design.
4. Can we mass produce in your local?
A: Yes, you can leave the mould in our factory, we can produce for
you.
5. Can we get a sample when mould finished?
A: Yes, we usually send out samples for customers' checking, then
mass production after samples comfirmed.
6. Before shipment, how to make sure the products quality?
1) We have QC to inspect the products before each shipment.
2) We can send you videos to show the production process.
3) You can come to visit our factory or ask a third party for
inspection.
7. How could I pay?
A: Paypal, Western Union, T/T are acceptable, so just let us know
which is convenient for you.
8. How to ship?
A: By sea/ By air/ By Express.