PVC Bag Shell ABS Injection Mold Multi Cavity Cold / Hot runner

Brand Name:LiQi
Certification:ISO,GE
Model Number:OEM
Minimum Order Quantity:Negotiable
Delivery Time:35-50 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Quanzhou Fujian China
Address: Anping Industrial Area Anhai town Jinjiang,Quanzhou,Fujian
Supplier`s last login times: within 14 hours
Product Details Company Profile
Product Details

PVC Bag Shell Parts ABS Injection Mold Accessories Mould Set


ABS Injection Mold Information:


Mold informationPVC Bag Shell Parts ABS Injection Mold Accessories Mould Set
Product MaterialABS,PP,PC,PA,PMMA,PS,POM and etc.
MoldbaseFUTABA,LKM,HASCO,DME you can choose
Cavity material45#,50#,P20,H13, 718 2738, NAK80, S136, SKD61 etc
RunnerCold/Hot runner
CavityMulti or single cavity
Standart partsHasco
Gate typeSide gate,Sub gate,Pin point gate,Edge gate etc
TreatmentHeat treatment and Nitriding,polish ect.
HRCH45~52
Tooling lifespan300,000-1,000,000 shots
Machine type90~650Ton
The standard of appearance of the products for stripeMT(Mold Tech),YS,HN series
Lead time15~30 days

ABS Injection Mold Pressure:


Because of ABS’s viscosity, higher injection pressures are needed than for many other materials, but lower pressures may still be suitable for smaller, simpler, or thicker products. Just bear in mind that if the injection pressure is too high, increased friction can cause molded parts to stick, which complicates their removal and adds to production costs. If the pressure is too low, mold shrinkage increases and can result in out-of-tolerance parts that won’t meet end-use requirements.


ABS Injection Mold Material Processing Concerns:


As the water absorption values in the table above show, ABS tends to absorb moisture. Therefore, it must be fully dried before processing, which adds time and costs — but failing to remove moisture can result in molded parts with cloudiness, bubbles, or surface lines. If your parts require a high gloss, highly reflective surface, more than nine hours of dry time may be required.


FAQ


1. When can I get the price?
A: We usually quote within 24 hours after we get your inquiry.


2. How long is the lead time for mold?
A: It depends on the mold’s size and complexity. Normally, it nees about 25-35 days.


3. I don't have 3D drawing, how should I start the new project?
A: You can provide us a sample, we will make 3D drawing design.


4. Can we mass produce in your local?
A: Yes, you can leave the mould in our factory, we can produce for you.


5. Can we get a sample when mould finished?
A: Yes, we usually send out samples for customers' checking, then mass production after samples comfirmed.


6. Before shipment, how to make sure the products quality?
1) We have QC to inspect the products before each shipment.
2) We can send you videos to show the production process.
3) You can come to visit our factory or ask a third party for inspection.


7. How could I pay?
A: Paypal, Western Union, T/T are acceptable, so just let us know which is convenient for you.


8. How to ship?
A: By sea/ By air/ By Express.





China PVC Bag Shell ABS Injection Mold Multi Cavity Cold / Hot runner supplier

PVC Bag Shell ABS Injection Mold Multi Cavity Cold / Hot runner

Inquiry Cart 0