Double Layer Mud Scraper Drilling Casing Pipe

Brand Name:FORUS
Certification:ISO
Model Number:6 5/8"
Minimum Order Quantity:30 Pieces
Delivery Time:30 days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: Room 11104, 2 Building, No.258 Taoyuan North Road, Lianhu District, Xi’an City, Shaanxi Province, China.710082
Supplier`s last login times: within 39 hours
Product Details Company Profile
Product Details

Drilling Casing Pipe Double-Layer Mud Scraper Size 6 5/8"


Introduction of double-layer mud scraper


Name and specification model: drill pipe mud scraper 2.3 inches, 2.7 inches, 3.5 inches, 4 inches, 4.5 inches, 5 inches, 5.5 inches, 6 5/8 inches, 2


7/8 inches, etc. 3. Performance/technical parameters/ Working principle: using RSS3, JSR, SBR raw materials. It has the characteristics of wear


resistance and mud erosion resistance. The operating temperature is -30℃-120℃, and it is installed under the drilling pan. During tripping, the


mud and oil stains on the surface of the drill pipe are scraped off, which is conducive to the collection of mud and prevents the sundries on the


drilling floor from falling into the wellhead.


Features


The double-layer mud scraper produced by our company is a disc structure. There are 4 overflow grooves symmetrically opened along the


circumferential side wall of the mud scraper body. The 4 overflow grooves are all connected to the hollow cavity in the mud scraper body. The


bottom surface of the mud scraper body is also provided with an overflow hole, and the overflow hole is communicated with the hollow cavity in


the mud scraper body.


The overall thickness of the mud scraper produced by our company is 75mm, and the thickness of the first layer and the second layer are both


25mm.


Double-layer mud scraper installation method


The mud scraper is installed under the drill disk and quickly installed on the drill pipe by rotating, which is convenient, safe, fast and has a long


service life.


Oil Drill Pipe Scraper


Working principle: The mud scraper on the outer wall of the drill pipe mainly adopts the slide way to centralize the mud scraper, so that the mud


scraper slides along the slide way. Under the action of the double-acting cylinder and the spring, the mud scraper is tightly attached to the annular


outer wall of the drill pipe lifted upward from the well. The mud scraper scrapes off the drilling fluid on the outer wall of the drill pipe lifted upwards


, so that the outer wall of the drill pipe column lifted out is clean, and there is no drilling fluid to pollute the environment.


A detailed description


Material: This product uses excellent wear-resistant nitrile rubber as the basic material, and there is a skeleton inside to prevent deformation.


Main application: It can prevent the drilling fluid from returning from the well, and remove the drilling fluid from the inner wall of the drill pipe to


prevent corrosion of metals.


Hardness: HS(Shore A)=85±5


Tensile strength: ≥18.0MPa


Operating temperature: -60 ℃ to 120 ℃


Specifications


2 3/8", 2 7/8", 3", 3 1/2", 4", 4 1/2", 5", 5 1/2", 6 5/8".


China Double Layer Mud Scraper Drilling Casing Pipe supplier

Double Layer Mud Scraper Drilling Casing Pipe

Inquiry Cart 0