vertical 180kw mini Kaplan hydraulic turbine generator for power plant
overview
Advantage of products: It is fit for the power station with middle and low head and the
output has the sweeping change, can run steadily and high-efficient
under various kinds of operating modes. It is equipped with a
vertical shaft, roll bearing seat or sliding bearing seat. There
are four different types of this kind in which there is open
channel intake type, open channel intake with pressure type, all
closed metallic spiral casing intake and concrete spiral casing
intake.
Supply Flancis, Kaplan/Propeller, Tubular and Pelton Hydro-turbine
generator unit, which can use for all kinds of water heads, our
supplying ability can be up to 100MW. The complete set of
Mechanical & Electric equipment from Water to Wire is also our
supply range.
A first-class technical service and installation team can provide
quality installation service and good after-sales service.
Specification
Name | 180kw mini Kaplan hydraulic turbine generator |
Water Head6.0 | 6.0 m |
Runner Diameters | 0.4 m |
Capacity | 180KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing
water collector, deaerator, high pressure and low pressure
superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment
provided by Runh Power
b. Installation, testing & trail run of all systems of a power
plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1. You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2. What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.