High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m

Brand Name:Wawushan
Minimum Order Quantity:1
Delivery Time:120 wordking days
Payment Terms:T/T
Place of Origin:China
Price:negotiable
Contact Now

Add to Cart

Verified Supplier
Address: Anxi village, Yuping town,Hongya county, China
Supplier`s last login times: within 20 hours
Product Details Company Profile
Product Details

Stainless Steel Turgo Wheel Turbine


The operation of a Turgo turbine is very similar to that of a Pelton turbine. In this type of turbine, high speed jets of water emerge from the nozzles that surround the turbine. These nozzles are arranged so the water jet will hit the buckets on one side at an angle of around 20°.This shallow angle allows the water stream to exit on the other side instead of being diverted backwards. Since the incoming and outgoing jets don't interfere like they do in Pelton turbines, this type of turbine is able to accommodate a higher flow rate.

Polishing based on CMM measurement report

Experienced employees polishing according to customer specific procedures

Several dimensional and quality controls through process

Compliance with all environmental standards thanks to the newest filtering technologies

Completed products are checked using four non-destructive testing methods (NDT).

Visual Testing (VT)

Liquid Penetrant Testing (PT)

Magnetic Particle Testing (MT)

Ultrasonic Testing (UT)

The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.


specification


runner materialstainless steel
runner typeTurgo
diameter1.1m
capacity500kw
blade No20PCS
weight900KG

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.


China High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m supplier

High Speed SS Turgo Water Wheel High Strength Long Lifespan 1.1m

Inquiry Cart 0