Add to Cart
400kw Small Water Turbine For Micro Hydro Power Plant
overview
We can supply hydraulic turbines system , hydro turbine system such
as kaplan turbine, propeller turbine, francis turbine and pelton
turbine, turgo turbine and so on, also with speed governor,
generator, valves, excitation system and its other accessories.
In order to guarantee the product quality,the company has advanced
testing instruments and strictly defers to ISO9001 quality
management system.It is strictly controlled the quality in every
process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only
high-quality components, and undergo rigid quality inspections to
ensure high efficiency and reliable operation.
Hydro-generating unit is the key power equipment in the hydropower plant.
The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.
medium and large hydro generators are designed for run-of-river and high head hydropower plants.
Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site.
Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power.
Specification
Name | 400kw Small Water Turbine |
Capacity2 | 450KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
we provide complete package for hydro power plant
1. The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the
request or Runh Power's recommandation or the request from the
commissioner.
b. Design of overall layout and all the sub-systems within the
parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review
and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing
water collector, deaerator, high pressure and low pressure
superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other
necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power
plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment
provided by Runh Power
b. Installation, testing & trail run of all systems of a power
plant (Optional)
c. Installation, testing & trail run of entire power plant
(Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.