Orange 5m3/H Small Shotcrete Pump Guniting Machine With Compressor

Brand Name:Tytion
Certification:CE, SGS
Model Number:PZ-5
Minimum Order Quantity:1 Set
Delivery Time:5-8 work days
Payment Terms:Western Union, L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: MEIJI ROAD NO. 18, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HENAN PROVINCE, CHINA
Supplier`s last login times: within 12 hours
Product Details Company Profile
Product Details

air compressor matched small type Shotcrete Pump dry mixed cement


Shotcrete Pump

Maintenance of Shotcrete Pump:
1. The rotor liner must be checked weekly and should be reground if there are deep scratches (more than 1mm deep).
2. The edge of the lining plate round hole should be checked frequently, it must keep sharp edge, if the edge is oblique cut, fine particles will easily penetrate into the bonding surface, increase wear. If a new seal plate is replaced and the old rotor liner hole has beveled edges, the service life of the new seal plate will be significantly shortened.
3. Timely grinding of the rotor liner to remove the worn part can save a lot of trouble and cost.


Parameters of Shotcrete Pump:

TechnicalParameters
ModelPZ-5PZ-6PZ-6FPZ-7PZ-9/WSP
Throughput(m3/h)5-5.566-779
Transport Distance (Tidal Spray) (m)200200200200200
Applicable Material (Cement/Sandstone) Ratio1:3~51:3~51:3~51:3~51:3~5
Applicable Material (Water/Ash) Ratio≤0.4~0.45≤0.4~0.45≤0.4~0.45≤0.4~0.45≤0.4~0.45
Aggregate size (mm)φ20φ20φ20φ20φ20
Working Pressure (MPa)0.2~0.40.2~0.40.6~0.80.6~0.80.6~0.8
Feeding height (m)1.11.11.11.11.1
Rotor speed (r/min)1111111111
Motor Power (KW)5.55.57.57.57.5
Motor speed (r/min)960960960960960


Operation Method of Shotcrete Pump:
After the preparation work is finished, the mixing material can be added to the machine. The machine operator should first open the main valve, the valve of the upper air duct opens 1/3 circles, and then adjust the air pressure of the lower air duct (to the cyclone) to about 0.05-0.1 MPa (depending on the delivery distance). Then the sprayer opens the nozzle valve and gives the wet rock surface. At this time, the operator can start the machine and start shotcreting. Now the working pressure is about 0.2-0.4 MPa. According to the water-cement ratio of mixtures and the length of conveying distance, after adjusting and determining the wind pressure to the cyclone, the upper air pipe valve is opened again until there is no more material leakage at the machine outlet.


Pictures of Shotcrete Pump:


Construction Site and Warehouse of Shotcrete Pump:

China Orange 5m3/H Small Shotcrete Pump Guniting Machine With Compressor supplier

Orange 5m3/H Small Shotcrete Pump Guniting Machine With Compressor

Inquiry Cart 0