Continuous 15KW Cement Grout Pump Environmental Hand Grouting Machine

Brand Name:Tytion
Certification:CE, ISO, SGS
Model Number:BW250
Minimum Order Quantity:1 set
Delivery Time:3-5 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: MEIJI ROAD NO. 18, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HENAN PROVINCE, CHINA
Supplier`s last login times: within 12 hours
Product Details Company Profile
Product Details

Large Capacity continuous working Manual Grout Pump environmental


Manual Grout Pump


Main Features of Manual Grout Pump:


1. The pump is widely used in the main sealing parts of the radial sealing structure, reliable sealing, simple process, convenient assembly and disassembly.
2. Variable frequency motor with stepless variable speed, suitable for different working conditions.
3. Piston sealing structure, reliable sealing, not sensitive to grout particles, suitable for a variety of media transportation.
4. Simple structure and convenient maintenance.
5. Less wearing parts, low maintenance costs (wearing parts are mainly piston, cylinder liner, valve seat, ball).
6. The pull rod and piston seat adopt taper sealing mode, and after tempering and heat treatment, easy disassembly and maintenance, quick replacement of the piston.


Technical parameters of Manual Grout Pump:


Cylinder number3
Bore diameter80mm
Piston stroke100mm
Diameter of suction pipe64mm
Diameter of outlet pipe32mm
Motor power15kw
Main shaft speed1450 r/min
Working pressure6 Mpa

Structure of Manual Grout Pump:


Manual Grout Pump is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.

Preparations before pumping of Manual Grout Pump:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.


China Continuous 15KW Cement Grout Pump Environmental Hand Grouting Machine supplier

Continuous 15KW Cement Grout Pump Environmental Hand Grouting Machine

Inquiry Cart 0