The Assembly of Pressure Grouting Machine Price:
The assembly sequence of grouting pump shall be reversed according
to the disassembly sequence, and the following points shall be paid
attention to during assembly:
1. Before assembly, all parts must be cleaned, and the surface of
parts should avoid bumping and scratching.
2. The torque of connecting rod bolts should be 60-80nm, and fixed
with a stop washer. The gap between connecting rod bearing bush and
connecting rod journal should be adjusted properly, and should not
be too tight or loose.
3. Roller bearing clearance should be adjusted appropriately.
4. The connection between the external thread of the pull rod end
and the internal thread of the crosshead end should be tightened.
5. The skeleton rubber pad at the joint of cylinder liner and pump
head, variable speed box and ball cage shall not have cracks or
other sealing damages.
6. The gap between piston and cylinder liner should be adjusted
properly, not too tight or too loose.
Warning: piston lock tightening efforts to appropriate, too tight
will increase the load of pump, the operation difficulty, too loose
easily leak slurry!!!!!!
7. The variable speed box of the grouting pump must be filled with
lubricating oil. The amount of oil should reach the position of the
window, not too little, but not too much.
8. Connection bolts at all parts should be tightened.
Technical parameters of Pressure Grouting Machine Price:
Cylinder number | 1 |
Bore diameter | 80mm |
Piston stroke | 73mm |
Diameter of suction pipe | 51mm |
Diameter of outlet pipe | 32mm |
Motor power | 7.5kw |
Main shaft speed | 1440 r/min |
Working pressure | 10 Mpa |
Structure of Pressure Grouting Machine Price:
Pressure grouting machine price is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.
The installation foundation of cement grouting pump should be
smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent
the vibration of the pump during operation.
Preparations before pumping of Pressure Grouting Machine Price:
After the pump has been stopped or reinstalled for a long time, the
following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission
mechanism.
5. Check the looseness of fasteners, especially the screw
tightening of rubber piston locking nut, cross head and piston rod
connection thread.
6. Check the suction height of the pump. The maximum suction height
of the pump should not exceed 2.5 meters in areas below 1000 meters
above sea level. In areas above 1000 meters above sea level, the
suction height of the pump should be reduced according to the local
atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank.
Generally, the mud level should be below 0.3-0.5 meters, and the
filter should be no less than 0.5 meters away from the bottom of
the mud tank.
Pictures of Pressure Grouting Machine Price: