Compact Structure Large Output PU Grouting Machine Convenient Operation

Brand Name:Tytion
Certification:CE, ISO, SGS
Model Number:BW250
Minimum Order Quantity:1 set
Delivery Time:3-5 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Zhengzhou Henan China
Address: MEIJI ROAD NO. 18, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HENAN PROVINCE, CHINA
Supplier`s last login times: within 12 hours
Product Details Company Profile
Product Details

PU Grouting Machine


Structure of PU Grouting Machine:


PU Grouting Machine(BW-250 type)is mainly composed of pump head, pump body, frame, protective cover, clutch, water filter, air chamber and pressure gauge. The pump body, pump head, frame and other parts are bolted to facilitate the decomposition of difficult transportation and removal.


Technical parameters of PU Grouting Machine:


Cylinder number3
Bore diameter80mm
Piston stroke100mm
Diameter of suction pipe64mm
Diameter of outlet pipe32mm
Motor power15kw
Main shaft speed1450 r/min
Working pressure6 Mpa

Structure of PU Grouting Machine:


PU Grouting Machine is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.
Preparations before pumping:
After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.


China Compact Structure Large Output PU Grouting Machine Convenient Operation supplier

Compact Structure Large Output PU Grouting Machine Convenient Operation

Inquiry Cart 0