UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm

Certification:ISO, ASME, EN
Model Number:Inconel cladding tube
Minimum Order Quantity:1000 tons
Delivery Time:30 working days
Payment Terms:L/C, T/T, Western Union
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Address: N0.1, Dongli Road, Donglai, Zhangjiagang City
Supplier`s last login times: within 46 hours
Product Details Company Profile
Product Details

UNS N06600 N06601 Nickel Alloy Inconel Cladding Tube Oil Gas Transport Steel Tube


Production Information of Inconel Cladding Tube


Surfacing welding is a welding process in which a layer of wear-resistant, corrosion-resistant and heat-resistant metal layer is deposited on the surface or edge of the workpiece, and the metal is melted by electric welding or gas welding and stacked on the tool or machine parts


Material
Nickel alloy steel / Inconel Cladding Tube
Grade
N02200, N02201, N08020, N08330, N08800, N08810, N08811, N08825, N06600, N06601, N06625, N06686, N06690, N04400, N10276, N06059
Spec.
B161/163, B165, B167, B407, B423, B444, B462, B514, B515, B516, B517, B535, B619, B622, B626, B704, B705, B729
O.D.
6~219MM
W.T.
0.50~25MM
Length
6 Meters or customized
Finish
Annealed & Picked or OD Mechanical Polish(up to 600#) or Bright Annealed & OD Polish
Tolerance
As per spec.
Application
Petroleum, chemical industry, chemical fiber, smelt, medical machinery, paper making, heat preservation and refrigeration, mechanical equipment, food, electricity, water conservancy, architecture, aerospace, navigation shipbuilding, environmental protection and boiler heat exchanger.
Package
Standard seaworthy package: 1.plywood case 2.wooden pallet package 3.bundle packageand other package or as customer request.
MOQ
500 kilograms
Supply Ability
500 tons/month
Port
Shanghai
Payment Term
T/T with 30% deposit, balance before shipment
Delivery Time
Usually within 30-60 days after payment


The most common problem in surfacing is cracking. The main methods to prevent cracking are as follows


1. Preheat before welding, control interlayer temperature and slow cooling after welding

2. Stress relief heat treatment after welding

3. Avoid multi-layer surfacing and use low hydrogen surfacing electrode

4. If necessary, build up the transition layer between the surfacing layer and the base metal (use the electrode with low carbon equivalent and high toughness)

Attention must be paid to butt welding:

1. According to the use requirements, reasonable selection of surfacing alloy

2. Reduce the dilution ratio of base metal as much as possible

3. Improve productivity

4. It is expected that the hardfacing metal and base metal have similar expansion coefficient and phase transformation temperature


Purpose of surfacing welding of Inconel Cladding Tube :


1. Reduce costs

2. Extend service life

3. Reduce maintenance

4. Reduce spare parts


Our Service


High-quality products supplier
Customized products
Flexible requirements for order size

Diverse products
Competitive price
Professional technical and quality team
Professional sales team


RFQ



Q: Are you trading company or manufacturer ?

A: We are manufacturer

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 25-35days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample extra

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us


China UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm supplier

UNS N06600 Inconel Cladding Pipe N06601 Nickel Alloy 0.50-25mm

Inquiry Cart 0