Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Brand Name:DAO
Minimum Order Quantity:57 m
Delivery Time:15 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Price:Variable
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

Fiberglass saturated resin installation for underground pipelines by no excavation


UV CIPP trenchless construction for sewer repair


At the same time as pulling the liner, the operator at the bottom of the inspection well shall be in place to assist the hose at all times to ensure that it is always at the bottom of the pipe without touching the top of the pipe.

If the material diameter is greater than or equal to DN600, it is recommended to apply grease or detergent water at the bottom of the material or above the bottom film to reduce friction.

At the same time, pay attention to the flatness of the material at all times to ensure that it is not knotted or bent. Otherwise, once the material enters the pipeline, it will be difficult to fully expand in case of winding, resulting in waste and economic losses.

At the end of the manhole section, the person responsible for dragging the bottom film and hose should use a hoist, which requires 3-5 tons.

Always pay attention to the safety of operators at the bottom of the manhole.

For the pipes below DN600, the lamp chain shall be used for curing, and the installation of the stainless steel tie at one end and the assembly of the lamp chain shall be completed on the ground.

For pipelines above DN600, the lamp holder shall be used for curing. If the manhole or wellhead is too small, the installation of stainless steel binding head and the assembly of the lamp holder shall be completed inside the pipeline.

When the hose is still 5 meters long, stop dragging and start to install stainless steel ties.


FunctionTrenchless repair
ApplicationCured-in-place-pipe
LengthAny length is possible

China Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation supplier

Underground UV Cured CIPP Equipment Cured Lining Fiberglass Saturated Resin Installation

Inquiry Cart 0