Brand Name:DAO
Minimum Order Quantity:27 m
Delivery Time:15 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Price:Variable
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city
Supplier`s last login times: within 3 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Materials for CIPP installation program in underground space management


Necessary tools for UV CIPP cure trenchless operation


1. One winch with a capacity of more than 3 tons, including a steel wire rope of more than 150m (depending on the length of the repaired pipe). It is best to adjust the speed, and the slower the speed cannot be adjusted, the better.

2. Light curing hose material, bottom film, binding cloth, and lamp film.

3. Ten 1.5-inch and two-inch ties respectively. Buy better and stronger tensioners.

4. Two small water pumps are used to pump water in the well chamber, or two Self-priming pumps.

5. Four interphones, two batteries for field communication.

6. Non-woven fabric or thick carpet 3m*10m, laid on the ground to protect materials.

7. Square timber 50-80cm, ready to be dried.

8. Several vises are used to fine-tune and fix materials at the bottom of the well.

9. Two lifting lugs are used for pulling materials.

10. One 750W axial flow fan is used for forced ventilation of the well chamber.

11. The 4-angle grinder with several cutting blades. It is recommended to use compressed air power.

12. Two traction ropes of 8mm and more than 100m are used to drag the bottom film and steel wire rope.

13. Portable power distribution box is used to supply power to the axial flow fan, small water pump, angle grinder and well lighting fixtures.

14. Several respirators or respirators with filters and goggles.

15. There are several cotton gloves, which are only used for changing bulbs. There are several rubber gloves.

16. One section of the 10m air duct is equipped with a D65 fire connector, and two sections are prepared.

17. 10m hose with 1-inch air compressor connector and air release valve at the other end.

18. The steel pipe is 40cm long and 65cm long, with bearings inside at both ends. It is used to walk the steel wire rope when dragging materials.

19. Several rolls of plastic film are used to protect the stainless steel tie head.

20. More than 10 industrial art knives are used for cutting hoses.

21. Two small crowbars are used to tighten stainless steel ties.

22. Six LED headlights are used for bottom lighting.


FunctionRepair sewer
ApplicationCIPP UV light cure
LengthAny length is possible

China CIPP UV Curing Process Installation Program Underground Space Management Materials supplier

CIPP UV Curing Process Installation Program Underground Space Management Materials

Inquiry Cart 0