safety cured in place sewer lining cipp technology Non excavation liner

Brand Name:DAO
Minimum Order Quantity:60m
Delivery Time:18 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Price:Variable
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

The non-excavation liner of high strength and quality for UV trenchless curing sewers


Classification:

The first method is preventive repair and salvage repair according to the priority of repair time.


Preventive repair: a city needs to reasonably plan and manage the underground pipelines and these fixed assets, including the laying year, main pipe diameters, geographical location, regional development planning (government location, core residential areas, major commercial areas, important industrial areas, etc.), as well as the status of underground surrounding pipelines, operation status, operation and maintenance records, resident complaint rate and other information, plan in advance, and lay out the repair plan and budget in advance, Repair according to priority.


Salvage repair: the underground pipe network system transports a large amount of sewage into the treatment plant every day. Ground dynamic loads such as large trucks will cause fatal damage to the underground pipe network. Especially in the thunderstorm season, a large amount of rainwater enters the drainage pipeline, causing an unknown risk of a pipeline rupture. Therefore, salvage repair may be required anytime, anywhere.


Fixing methodNon-excavation
MethodCIPP-UV trenchless
LengthAny length is possible

China safety cured in place sewer lining cipp technology Non excavation liner supplier

safety cured in place sewer lining cipp technology Non excavation liner

Inquiry Cart 0