Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG

Brand Name:DAO
Certification:TUV
Model Number:DN200-1650
Minimum Order Quantity:30m
Delivery Time:15 workding days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

CIPP-UV material for municipal sewers repair DN200-1650 by NO-DIG


DAO CIPP-UV cure material is designed for underground municipal sewer trenchless repair using Cured-in-Place-Pipe technology. It is good to use the newly developed LED cure system or the traditional voltage Mercury light cure system, both types work great!


UV cure liner material features below:

1. The repaired pipeline structure meets the strength, stability, and deformation requirements TUV test report.

2. After repair, the pipeline is smooth and the water stream will be better.

3. The service life is more than 50 years according to the 10000hours creep test report by TUV.

4. Good ductility and fit the pipe wall closely, without holes.


Product parameters
Bending modulus (MPA)≥ 3100
Bending strength (MPA)≥ 120
Tensile modulus (MPA)≥ 3200
Tensile strength (MPA)≥ 82
Mild bending resistance (MPA)≥ 47
Short term bending elastic modulus (MPA)≥ 6670
Tensile strength (MPA)≥ 61
Applicable pipe diameterDN200-DN1650

China Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG supplier

Relining UV CIPP Lining Water Main Municipal Sewers Repair DN200-1650 NO DIG

Inquiry Cart 0