Home /Custom Fabrication Services /

Custom Processing Automobile Transmission Equipment Shell Parts

Custom Processing Automobile Transmission Equipment Shell Parts

Brand Name:Customized
Certification:ISO9001:2015,RoHS
Model Number:Custom made
Minimum Order Quantity:5PCS
Delivery Time:10-20 work days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Site Member
Location: Shenzhen China
Address: No.18,Youmagang Industrial Zone, JiangShi Village Gongming Town, Bao'An District Shenzhen City, China
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

【Part name】 Processing of shell parts of automobile transmission equipment

【Manufacturing process】CNC precision machining

【Surface treatment】 Grinding polishing + blue oil injection

【Product Features】 High precision complex structure

【Processing Equipment】

3-axis / 4-axis / 5-axis CNC machining centers (computer gongs), drilling tapping machines, CNC lathes, precision grinders, gantry milling machining centers, molding machines, hot-pressing tanks, western machines, wire cutting (fast / medium / slow walking) Wire) other processing equipment.


【Accuracy size】


Precision of metal parts:


Milling tolerance ± 0.01mm, turning tolerance ± 0.005mm


Plastic parts accuracy: ± 0.05mm


Size: 2200mm larger (removable parts are limited by size)


【Quantity Delivery】


Samples (1 order): 2-7 days


Small medium batch processing: 7-20 days


Mass production: 20-35 days

【material】


Metal: aluminum alloy, magnesium alloy, magnesium lithium alloy, low carbon steel, stainless steel, titanium alloy, copper, etc.


Plastic: ABS, PC, POM, PEEK, PP, acrylic (PMMA), nylon, Teflon, PPS, nylon + glass fiber, etc.


Composite material: carbon fiber


【Surface treatment】


After processing most of the surface of automobile shell parts, such as sand blasting, hard anodizing, micro-arc oxidation, grinding, polishing, oil spraying, blackening, electroplating, vacuum plating, chemical plating, phosphating, passivation, silk screen, flower Treatment process.


Service
CNC Machining
Turning and Milling
CNC Turning
Stamping Parts
OEM Parts
Material
1. Aluminum: AL 6061-T6, 6063, 7075-T etc
2. Stainless steel: 303,304,316L, 17-4(SUS630) etc
3. Steel: 4140, Q235, Q345B,20#,45# etc.
4. Titanium: TA1,TA2/GR2, TA4/GR5, TC4, TC18 etc
5. Brass: C36000 (HPb62), C37700 (HPb59), C26800 (H68), C22000(H90) etc
6. Copper, bronze, Magnesium alloy, Delrin, POM,Acrylic, PC, etc.
Dimension
Customized
Surface Treatment
Zinc/Nickel/Chrome Plating, Passivation, Hardening, Clear Anodizing, Black Anodizing, Black Oxide, Coating, Degreasing, Brushing,etc.
Main Equipment
CNC Machining center(Milling), CNC Lathe, Grinding machine, Cylindrical grinder machine, Drilling machine, Laser Cutting Machine,etc.
Drawing format
STEP,STP,GIS,CAD,PDF,DWG,DXF etc or samples.
Tolerance
+/-0.01mm ~ +/-0.05mm
Surface roughness
Ra 0.1~3.2
Inspection
Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier,CMM
Packing
Plastic/paper wrap, bubble bag, PE foam, EPE cotton, PP bag, Custom made Outer packing: carton box, steel pallet etc.





FAQ:


Q1: How to enjoy the OEM services?

A1: Usually, base on your design drawings, we give some technical proposals and a quotation to you, after your agreement, we produce for you.


Q2: Can I get a sample for quality check?

A2: Sure, We are willing to provide with sample for quality and function testing.


Q3: Will my drawings be divulged if you benefit?

A3: No, we pay much attention to protect our customers’ privacy of drawings, we can sign NDA.


Q4: How do you control the quality?

(1)Material inspection--Check the material surface and roughly dimension. (

2)Production first inspection--To ensure the critical dimension in mass production.

(3)Sampling inspection--Check the quality before sending to the warehouse.

(4)Pre-shipment inspection--100% inspected by QC team before shipment.


Q5: How about the lead time?

A5: Generally, 10 -15 days for samples, 25 -30 daysfor mass production.




China Custom Processing Automobile Transmission Equipment Shell Parts supplier

Custom Processing Automobile Transmission Equipment Shell Parts

Inquiry Cart 0