Add to Cart
Online Automatic Depaneling Machine EXE-880AT
Online Automatic Depaneling Machine Parameters:
keywords | Online Automatic Splitter | PCB board cutting thickness | 0.2mm-6.0mm |
Sub-board work range | 300mmx350mm | Main engine and dust collector voltage | 220v 1φ and 3φ |
XYZ drive mode | ac servo motor | power consumption | 3.5kva |
Number of motion axes | 7 axes | Static Elimination Gun | |
program teaching method | Color CCD video intuitive teaching input | visual system | High-resolution digital camera |
Operation interface | win7 window interface | drive motor | AC brushless servo motor |
Upper vacuum power | 2hp | Mechanical pick and place arm | Anti-static vacuum nozzle |
Lower dust collector power | 3hp (option 5hp) | Feeding method | rail transport |
Cutting spindle sycotec (Germany) | max80000rpm (automatic tool change) | Outlet method | Belt conveying or carrier output or rail conveying |
x-y ac servo speed | 0-1000mm/sec | transfer method | Vacuum suction nozzle adsorption transfer |
z ac servo speed | 0-800mm/sec | flow direction | left→right |
x-y repeatability | ±0.01mm | program backup | USB interface |
Cutting accuracy | ±0.02mm | control method | Dedicated controller |
CCD camera calibration accuracy | ±0.01mm | Dust cabinet size | 640mm×785mm×1760mm(d×w×h) |
Split plate stress value | Below 300uε | Machine size | 2014mm×1230mm×1650mm(d×w×h) |
Tool diameter | 0.8-2.3mm | Host + dust collector weight | 1000kg |
Introduction To Equipment Configuration:
(1): Clip-on plate-taking structure
1. Place the product sub-board fixture on the processing platform sub-board. After the processing is completed, clamp the parting jig and place it on the track to flow into the next process.
(2): The special product sub-board jig enters the track mode
(3): Discharge of special product plate jig guide rail
1. After the product is cut, the reclaiming fixture clamps the
entire product fixture puts it on the unloading track, and
transports it to the next production process.
(4): Automatic tool change mode
1. Adopt automatic tool changing spindle imported from Germany.
Save time, realize automation, reduce human factors, high precision
and strong stability
2. Five sets of milling cutter magazines are built-in, which is
convenient for automatic replacement of milling cutters and meets
the needs of sub-board processing.
(5): The structure of the vacuum suction cup
1. Pick-and-place device: automatic loading and unloading (modular
vacuum suction claw, vacuum device, can be independently
controlled)
2. Transmission structure: X2 axis moves Z2, Z3 axis suction cup,
AC servo motor control.
3. Board taking speed: 0-1000mm/sec (can be set)
(6): Special product fixture tray discharge method
1. The vacuum suction cup take-up reel sucks the cut product in a
one-time vacuum, places it on a special product fixture, and
transports it to the next production process.
Quality Assurance And After-sales Service:
1. The overall warranty period of the equipment is one year. If
there are quality problems, after-sales maintenance and replacement
are provided free of charge.
2. The after-sales service personnel are all senior professional
and technical personnel of the company. After the formal training
of the company, you can work alone after passing the exam.
3. After the after-sales department receives the equipment failure
notification, if the equipment fails to work normally, the Pearl
River Delta will reply within half an hour, and dispatch personnel
to the scene to solve it within 2 hours; the area outside the Pearl
River Delta will reply within half an hour, and then according to
the specific situation, within 24 hours Send after-sales personnel
to the scene to solve the problem. (If the startup fails to produce
normally, the after-sales personnel communicate with the customer
and arrive at the scene within the time required by the customer).
4. The company's after-sales personnel are on standby 24 hours a
day, regardless of Saturdays, Sundays and holidays.
5. After the equipment arrives at your company, our company will
arrange engineering and technical personnel for installation and
commissioning.
6. Our company can arrange after-sales technicians to stay in the
customer's company for three days, responsible for training and
technical guidance (the time can be extended according to the
appropriate requirements of the customer) until they are accepted.
7. Our after-sales technicians are responsible for comprehensive
training. Your company's operators and technicians will
wholeheartedly serve the installation and operation of our
company's equipment without reservation.
8. Under the premise of the customer company's request, our company
can help the customer company to carry out the commissioning test
of the sub-board machine for its technicians.