

Add to Cart
15-18 Chestnuts per Lane per Second High Capacity Sorting Machine Enchaned Productivity
Product Introduction
In the ever-evolving landscape of chestnut processing, speed becomes a decisive factor. Our Chestnut Sorting Machine takes the lead with an impressive sorting speed of 15-18 chestnuts per lane per second. Dive deep into the intricacies of this rapid sorting capability, understanding the synchronized dance of conveyors and cameras that enable such high-speed precision. Uncover the real-world implications of this efficiency, from enhanced productivity to reduced labor costs, positioning our machine as an invaluable asset for modern chestnut processing facilities.
Material Sorting Effects
Product Specification
No. | Lanes | Output (t/h) | Voltage (V/Hz) | Power (kW) | Air Pressure (MPa) | Air Consumption (m3/min) | Dimension (LxWxH mm ) | Weight (kg) |
LJG04-1208B | 12 | 2 | 380/50 | 6 | >0.6 | 5 | 9276*3662*2004mm | 4250 |
Remarks: The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Due to chestnut sorting machine is very large, usually it will be
module packed with large durable pallet and covered stretch film to
ensure good condition during long-term ocean shipment. For other
small parts, they're packed into multi-layer corrugated boxes.
All packages is aimed to protect the machine from any damaged
during the complicated shipment.
Warranty
We provide 1-year warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our chestnut or not?
Can you send a process video?
A: We accept chestnut samples and take videos during real
processing, so you will have an obvious look at the effect to our
dates sorting equipment. In addition, your visit to our
manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after
contract signed and deposit received, namely after our proposal is
agreed to cater your actual demands.