0.4-1.8mm 1250mm Continuous Galvanizing Line Process For Steel Industry

Brand Name:JJRS
Minimum Order Quantity:1
Delivery Time:7-10 months
Payment Terms:T/T, L/C
Place of Origin:China
Price:USD$1,000,000~USD10,000,000
Contact Now

Add to Cart

Active Member
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

0.4-1.8mm 1250mm Continuous Galvanizing Line Process For Steel Industry

This production line is galvanizing line of cold rolled steel. It mainly includes uncoiling section, welding platform, entry looper, annealing furnace, zinc pot, air knife system, cooling system after galvanizing, tension leveler, passivation section, exit looper, reserve postion for electrostatic oiler and some other equipments. The production line's product position is architectural material, roof, panels, etc. Its function inlcudes annealing, galvanizing, finishing, straighterning, pre-painting oil. etc.


According to technical operation, this line could be divided into three sections: Entry section, process section and exit section
1. In Entry section
Entry coil skids I# & II# →Coil Loading Car I# & II# → Pay off Reel I# & II# → Decoiling guide board I# & II# →I# & II# Decoiling Pinch Delivery Machine I# & II# → Hydraulic Transverse crop and end Shearer →Scrap collecting disposal device →1# Deflector Roll→ Carry over conveyer →automotive welder→ Crescent shearer →Pinch Delivery Machine after welding →Tension Bridle Roll I#→ Entry Accumulator → CPC Single Roll Centering Machine I#& II# &3#
2. In process section
CPC single Roll Centering Machine IV# →Tension Bridle Roll II#→ CPC Single Roll Centering Machine V#→Tension Bridle Roll III#→Tensional strength Measuring Machine →Annealing Furnace → Furnace nose →Zinc Pot → Submerged Roll → Air Knife → Vertical Air Cooling Device → High Tower Deflector Roll → Horizontal Air Cooling Device → Water Quench Tank → Squeezer After Water-Quenching → Hot Air Blowing Off Unit I#→ CPC Double Roll Centering Machine I# →#online zinc coating thickness Gauge →Tension Bridle Roll V# →Skin pass gauge→ Skin pass squeezer → Hot Air Blowing Off Unit II #→Tension Bridle Roll V#→ Tension leveler → Tension Bridle Roll VI#→Passivating Rolling-Coater → Passivating baking Furnace
3. Exit section configured equipments:
Exit Accumulator → CPC Double Roll Centering Machine II# → Tension Bridle Roll VII# →pinch Shear→ Exit Pinch Delivery Machine → Tension Reel (armless EPC)→ Coil Unloading Car → Belt wrapper


Technical document descriptionSchedule for the Deliverables
Civil construction and energy supply requirementsWithin 7 days since the effective of contract
General equipment layout drawingsWithin 8 weeks since the effective of contract
Equipment foundation condition drawing and embedded pipeline drawingsWithin 10 weeks since the effective of contract
Major equipment catalogueWithin 3 months since the effective of contract
Split shipment arrangementWithin 4 months since the effective of contract
Spare part list and drawingsBefore hot commissioning of the equipments
Equipment operation maintenance manualWithin 1 week since the check and acceptance at the buyer’s site

China 0.4-1.8mm 1250mm Continuous Galvanizing Line Process For Steel Industry supplier