High Speed Railway 250-300 Ton Bridge Erecting Machine Continuous

Certification:CE ISO GOST
Minimum Order Quantity:Negotiation
Delivery Time:30 workdays
Payment Terms:L/C, T/T
Place of Origin:Henan,China
Price:Negotiation
Contact Now

Add to Cart

Verified Supplier
Location: Xinxiang Henan China
Address: No.1,Wei'er Road, Changyuan Crane Industrial Park, Xinxiang City, Henan Province.China
Supplier`s last login times: within 35 hours
Product Details Company Profile
Product Details

250 Ton 300t High Speed Railway Bridge Erection Machine Continuous Beam With Low Center Of Gravity


Highway Bridge Erection Machine Application:


The bridge erecting machine can be roughly divided into highway bridge erecting machine and railway bridge erecting machine according to the use. It can also be divided according to different structures, and there are many names, such as auxiliary guide beam type, frame transport integrated type, tunnel type and so on. It can also be divided according to the erection method, segment assembly type, whole hole type, etc. There are also points according to the tonnage. Generally, the tonnage of the highway bridge erection machine is relatively small, generally less than 300 tons. Railway bridge erecting machines, especially high-speed railway bridge erecting machines, generally have a relatively large tonnage, 450 tons and 900 tons, which are very common.


Bridge Erecting Machine Parameters:


Product ModelSH50-160SH40-140SH40-120SH35-120SH30-80
Span (m)5040403530
Lifting Capacity (T)160—26014012012080
Crane Moving Speed (m/min)2.72.72.72.72.7
Trolley Moving Speed (m/min)4.54.54.54.54.5
Trolley lifting Speed (m/min)0.80.80.80.80.8
girder-carrying speed of rear part (m/min)0-90-90-90-90-9
Skew Bridge Angle (°)4545454545
Applicable curve radius (m)R350R300R300R300R300
Power (KW)9696969696

The composition of bridge erection machine:


The bridge erecting machine is mainly composed of the arm, the No. 1 hoisting trolley, the No. 2 hoisting trolley, the No. 1 column, the No. 2 column, the No. 3 column, the hydraulic system, the electrical system, the diesel generator set and the safety protection monitoring system.

The beam is transported by the beam transporter to the rear of the bridge erecting machine to feed the beam, the hoisting trolley lifts the girder to pull the beam, and the position of the box girder is fine-tuned in the air. It can erect 32m, 24m, 20m double-line whole-hole box girder, adapt to erect minimum curve radius R5500m, adapt to erect maximum longitudinal slope 20‰, rated lifting weight 900t.


Bridge Erecting Machine Photo:


China High Speed Railway 250-300 Ton Bridge Erecting Machine Continuous supplier

High Speed Railway 250-300 Ton Bridge Erecting Machine Continuous

Inquiry Cart 0