MX75 Cross Flow Cooling Tower Film Fill Pvc Black 1520 Mm

Brand Name:XL
Certification:SGS
Model Number:XL-1220-MA
Minimum Order Quantity:10 square meters
Delivery Time:10 working days
Payment Terms:Western Union, T/T, MoneyGram, D/P, D/A, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: Zhounan Road,Wanshi Town,Yixing City,Wuxi,Jiangsu Province
Supplier`s last login times: within 15 hours
Product Details Company Profile
Product Details

MX75 Cross Flow Cooling Tower Film Fill, pvc Cooling Tower Material, Black Cooling Tower Media

Description:

Hanging type cooling tower fills description:

With cooling towers, fill selection is a critical aspect in this regard. High efficiency film fill may seem the most desirable option. However, if poor water quality causes this fill to rapidly foul and plug, it may incur excessive maintenance costs.
CF1220mm pvc fill is a hanging film type cooling tower fill, which spreads the water into a thin film.
When doing installation, sheet A and sheet B(male and female) are assembled one after another with industrial glue. Sheet solid by adjoining all cones on the fill sheets to create an interference fit, thus attaching the loose sheets together into module. Then the assembled block will be hung into the cooling tower.
CF1220mm cross fluted fills typically provide high specific surface area and high thermal performance but exhibit poor anti-fouling characteristics due to the geometry that forces many deviations to the flow path.
Flute spacing significantly affects fill performance; smaller spacing increases the surface area but also raises the potentialseverity of fouling.

Specifications:
Tech Date
Sheet Width(mm)760/820/920/1020/1220/1420/1530-1510mm
Sheet Length206MM*N(N=4,5,6,7,8,9,10,11,12......)/customized
Thickness0.32-0.6mm/customized
Sheet Spacing19-20mm
Colorgrey/white/black
MaterialPP/PVC/CPVC

Related Cooling Tower Film Fill

Cleaning Cooling Tower Tips

Cooling tower packing cleaning method:


1. Manual cleaning of the slag falling off in the cooling tower;


2. Rinse the packing repeatedly with a high-pressure water gun to remove the sludge and scale under cleaning;


3. Dissolve the TNB descaling agent with hot water at about 50°C, and then use the flushing pump to rinse the filler repeatedly until the scale is rinsed off (if the filler has a long service life, causing aging and collapse, it is recommended to replace the filler), and add algaecide at the same time. Completely kill biological algae and;


4. After confirming that all parts of the system are cleaned, drain the sewage;


5. Rinse the packing and the inside and outside of the tower body with clean water;


6. Restore all parts of the system, replenish water and use it;


7. After all recovery, please check and accept the management personnel of Party A;


8. Evacuate Party B's belongings and clean the site;

PACKING AND DELIVERY



About US

1. How can I get a quote?

Contact our service people and tell them your demands on fill sizes, quantities, they will give you a very detailed quotation list.
2. How can I know how many pcs of fills I need?
Very simple way is to count the fill pcs in the cooling tower.
Another way is to measure the area sizes that fill take within the cooling tower.
3. Can I get samplesl for test?
Yes, please contact our service people, you will get free samples for test.
China MX75 Cross Flow Cooling Tower Film Fill Pvc Black 1520 Mm supplier

MX75 Cross Flow Cooling Tower Film Fill Pvc Black 1520 Mm

Inquiry Cart 0