Railway Fire Resistant Gangway In Train NR Steel Train End Gangways

Brand Name:HTR
Minimum Order Quantity:10 SETS
Delivery Time:within 45 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Place of Origin:CHINA
Packaging Details:Carton
Contact Now

Add to Cart

Verified Supplier
Location: Chongqing Chongqing China
Address: A1-3-1, Xinrui Zone, No. 25-1-3, Keyuan 1st Street, Jiulongpo District, Chongqing
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

Product review

A gangway connection (or, more loosely, a corridor connection) is a flexible connector fitted to the end of a railway coach, protecting from windy and raining and enabling passengers to move from one coach to another without danger of falling from the train. It can be divided to following types:

Iron vestibule diaphragm

Rubber vestibule diaphragm

Pucker vestibule diaphragm


Product specification


StandardTB/T3094-2015 eqv UIC
ItemStandard data(on test piece)
Hardness (Shore A)73±5
Tensile strength(MPa)≥19
Elongation(%)≥440
Resistand to tearing(KN/M)≥20*2

Flexibility

-30℃≥85% 20℃≥85%

70℃≥85%

after aging for 7 days at 70℃0-10 shore A
Resistance to Abrasion≤0.3(cm3/1.61km)

Resistance to Ozone

crake length≤10mm*3 crake depth≤1mm*4
Resistance to fireDIN 5510-2 S1
flexural property(5*104)No crack
brittleness temperature≤-50

Structure

The main components of rubber gangway are steel frame, rubber sheet which consists of horizontal and vertical tube, inner&outer steel pressing plate and fixing bolts


Frame material:Q235 Thickness:.


Tube Width

It can be customizedThe width of our horizontal rubber is 1650mm, which allows 1200mm width of door.


Tube Height

It can be customized. The longest size of our vertical rubber can reach 2100mm.


Drawing

Production Equipment

Test Equipment

Application

Related product


China Railway Fire Resistant Gangway In Train NR Steel Train End Gangways supplier

Railway Fire Resistant Gangway In Train NR Steel Train End Gangways

Inquiry Cart 0