Professional Concrete Distributor Boom Climbing Structure For Construction Buildings

Brand Name:Zoomwolf
Certification:ISO9001
Model Number:HGY33
Minimum Order Quantity:1 Set
Place of Origin:Changsha,China
product:Concrete Distributor Boom
Contact Now

Add to Cart

Active Member
Location: Changsha Hunan China
Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

Professional Concrete Distributor Boom / climbing Structure

Structural characteristic of ZOOMWOLF concrete placing boom

1, Internal hydraulic oil tank, compact structure, easy installation.
2, The square column is formed by bending and piecing welding of low-alloy steel plate, with beautiful appearance, good strength and rigidity.
3, Floor climbing frame structure is simple, easy to disassemble and install.

4, Under the premise of meeting the requirements of strength and stiffness, the optimized design of the boom pursues light quality.
Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.

For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;

Technical Specifications
Model of placing boomHGY36S-4RHGY36P-4RHGY36SC-4RHGY36PC-4R
PerformanceMax. radius (m)36
Free standing height,Slewing range22.7m,400°
Working temperature(℃)0~60℃
Counter weight(kg)/2930
Total weight(kg)2500027930
Supply power to equipment380V/50Hz
Electric motorMotor modelY2-200L-4
Power(kW)30
Hydraulic systemSystem pressure(MPa)32
Flow(L/min)34473447
Oil tank capacity(L)280
Control mode(Cable+Radio) remote control
Clearing mode for concrete pipeWater clear / Dry clear
Section of tubular column (m×m)0.75×0.75
Arm(Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose (〃×m)5〃×3
The first sectionLength(m)12.3
Articulation-2.5°~82.5°
The second sectionLength(m)7.9
Articulation0°~180°
The third sectionLength(m)7.9
Articulation0°~180°
The forth sectionLength(m)7.9
Articulation0°~180°
ClimbingClimbing modeCylinder Jack Lifting
Internal climbing step distance(m)0.52
Floor frameHole prepared in floor
Shaft frameSize of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frameClimbing(m)3
Placing concrete(m)6
Rest(m)6






About the model
HGY ×× S or P C or blank - × R
① ② ③ ④ ⑤

① Hydraulic concrete distributor
② Round number of Max.radius(m)
③ Step speed regulation(S)or
Proportional control speed regulation(P)
④ With(C)or without(blank) counter weight
⑤ Arm section number ×Roll folding(R)

Identification letter description
S: Step-speed adjustment
P: Proportional (Stepless speed regulation)
C: Counter weight

The sample
1. Model HGY33S-3R means:
Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.
2. Model HGY33PC-4R means:
With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.


China Professional Concrete Distributor Boom Climbing  Structure For Construction Buildings supplier

Professional Concrete Distributor Boom Climbing Structure For Construction Buildings

Inquiry Cart 0