High Efficiency Electric Placing Boom Step Speed Or Stepless Speed Long Service Life

Brand Name:Zoomwolf
Certification:ISO9001
Model Number:HGY33P-4R
Minimum Order Quantity:1 Set
Place of Origin:Changsha,China
product:Concrete Placing Boom
Contact Now

Add to Cart

Active Member
Location: Changsha Hunan China
Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

Electric Placing Boom Step Speed Or Stepless Speed


Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.


For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;


Technical Specifications
Model of placing boomHGY33S-4RHGY33P-4RHGY33SC-4RHGY33PC-4R
PerformanceMax. radius (m)33
Free standing height,Slewing range22.7m,400°
Working temperature(℃)0~60℃
Counter weight(kg)/2930
Total weight(kg)2230025230
Supply power to equipment380V/50Hz
Electric motorMotor modelY2-200L-4
Power(kW)30
Hydraulic systemSystem pressure(MPa)32
Flow(L/min)34473447
Oil tank capacity(L)280
Control mode(Cable+Radio) remote control
Clearing mode for concrete pipeWater clear / Dry clear
Section of tubular column (m×m)0.75×0.75
Arm(Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose (〃×m)5〃×3
The first sectionLength(m)9.3
Articulation-2.5°~82.5°
The second sectionLength(m)7.9
Articulation0°~180°
The third sectionLength(m)7.9
Articulation0°~180°
The forth sectionLength(m)7.9
Articulation0°~180°
ClimbingClimbing modeCylinder Jack Lifting
Internal climbing step distance(m)0.52
Floor frameHole prepared in floor
Shaft frameSize of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frameClimbing(m)3
Placing concrete(m)6
Rest(m)6

The necessity of cleaning pipes after each shift is completed

The purpose of timely cleaning the pipe of the placing boom is to ensure that the pipe will not be blocked because of the residual set concrete in the pipe during the next concrete construction. Therefore, it is necessary to clean the conveying pipe in time before the initial setting of residual concrete in the pipe after construction.

About the model

HGY ×× S or P C or blank - × R

① ② ③ ④ ⑤

① Hydraulic concrete distributor

② Round number of Max.radius(m)

③ Step speed regulation(S)or

Proportional control speed regulation(P)

④ With(C)or without(blank) counter weight

⑤ Arm section number ×Roll folding(R)


Identification letter description

S: Step-speed adjustment

P: Proportional (Stepless speed regulation)

C: Counter weight


The sample

1. Model HGY33S-3R means:

Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.

2. Model HGY33PC-4R means:

With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.


China High Efficiency Electric Placing Boom  Step Speed Or Stepless Speed Long Service Life supplier

High Efficiency Electric Placing Boom Step Speed Or Stepless Speed Long Service Life

Inquiry Cart 0