IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control

Brand Name:Sinuo
Certification:Calibration Certificate (Cost Additional)
Model Number:SN774
Minimum Order Quantity:1
Delivery Time:30 Days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: Room 101, 1st Floor, No. 6, Third Street, Pingshan Industrial Zone 511495, Shibi Street, Panyu District, Guangzhou, China
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control


Product Information:

The Tracking Flammability Test Chamber is designed and manufactured according to the standard requirements of IEC 62368-1:2018 clause 5.4.3, IEC 60335-1 clause 29.2, Annex N, IEC 60112, etc.

It is used for determination of the relative resistance to tracking performance that solid electrical insulating material under the action of an electric field, when the surface exposed to water containing impurities.

The working principle of the leakage tracking test (tracking index testing) is that the conducting liquid (0.1%NH 4 CL) of required volume in the required height (35mm) and required time (30s) drops with the voltage between the platinum electrodes (2mm × 5mm) on the surface of solid insulating material. Thus, the users evaluate the tracking resistance performance of solid insulating material surface under the combined influence of electric field and humid or contaminate medium. In a word, this device is used to measure the compare tracking index (CT1) and electrical resistance index (PT1).


Technical Parameters:

Applied StandardIEC 62368-1
Clause5.4.3
Working voltageAC 220V/50Hz,1KVA
ControlPLC
Display7-inch color touch screen
Testing voltage0~600V adjustable,precision 1.5%
Timing device9999X0.1S
ElectrodePlatinum electrode and brass electrode each for a pair
Electrode dimension

(5±0.1)×(2±0.1)×(≥12), 30°slant

Electrode included angle and distance60°±5°, distance is (4±0.1㎜)
Electrode pressure1.00N±0.05N(digital display is optional)
The interval of dropping liquid30±5S, adjustable
Dropping liquid height35±5mm
Dropping liquid delay0.2S(solenoid valve opening time)
Dropping liquid size45~50 drip/cm3
Time-delay circuit2±0.1S (in 0.5A or larger current)
Short-circuit pressure drop8% MAX
Short-circuit current1±0.1A 1%
Wind speed0.2m/s
Environmental requirement0~40℃, relative humidity≤80%, in the place of no obvious vibration and corrosive gas
Equipment size & weight1100mm* 550mm* 1100mm, 180KGS
China IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control supplier

IEC 62368-1 Clause 5.4.3 CTI PTI Tracking Flammability Test Chamber PLC Control

Inquiry Cart 0