

Add to Cart
Machine introduction:
Disposable plastic shoe cover making machine with non-woven
This Automatic Plastic Shoe Cover Machine Is an automatic and producing elastic plastic shoe cover which is a specialized machine. The output can reach 150-170 PCS/min. It is suitable for hospitaldustless industry and disposable goods. The whole machine make the raw materials into the finished product more easily and the process fully automated. It required one person to feed.
Machine advantage:
1.Upgrade the new heating system. Adopts rotary collector ring for heating, prevent people from dangerous of electric exposure. |
2.Change the old motor transmit system to reduction gear motor. Which makes machine work more stable. |
3.With inverter to control speed, easy operation, high output and low power consumption. |
4.New system make elastic seal strong. |
5.Upgrade the two side elastic seal. Make it seal without non-woven, make products low cost, but make machine more efficient and higher output. |
6.With non-woven interface, more solid, more beautiful |
Production application :
This machine is widely used in :
Technical parameter
material | PE,CPE |
machine size | 1500mm*1500mm*1700mm |
output | 150-170pcs/min |
power | 220v/380v |
weight | 750kg |
power consumption | 3.5kw |
finish products size | 400*160mm or customized |
material needed | Elastic, plastic film. |
Machine model | GD-400 |
Our Advantages:
1. ISO 9001: 2000, GSG, SGS, CE, Production Assessment, Gold
Supplier certificated
2. All machines will be examined and tested before delivery by 5
professional engineers (with more than 20 years machine experience)
3. Perfect after-sale system
5. Yearly Production Capacity -- 200-300 sets
6. Prompt Reply Within 18 Hours
TERMS & CONDITIONS:
One Month
Effected within 30 days from the date of signing the purchase contract and receipt of T/T affected for advance payment.
Ningbo Port
Effect payment by T/T in two installments exactly 30% advance payment and remaining 70% payment before shipment
100% brand new
China.
Wooden Pallet Packing
Installation and Adjusting: If required, the seller will dispatch the technician to your country for installation, adjusting the machine and training the workers at your plant. This price is inclusive of the fee of installation and debugging. However the buyer should take on all costs required during our technician’s stay in the buyer’s country, including round airplane tickets, accommodation, and food .
FAQ
Within one week after machine arrival your factory.
We will finish installation and training within 15days.
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person.
All our machine have one year guarantee, starting from finished installation. And life long after sale service.
We also can do service for you, but you need pay salary for my technician 100USD/day.
We would express the free replacement parts during the warranty date.