Home /Corner Guards /

Bridge Project Box Girder Formwork Precast Concrete Forms Molds Short Recycle Time

Bridge Project Box Girder Formwork Precast Concrete Forms Molds Short Recycle Time

Brand Name:BOYOUN
Certification:SGS; ISO
Model Number:Formwork System
Minimum Order Quantity:50 Ton/Tons
Delivery Time:50days
Place of Origin:Shandong, China
Contact Now

Add to Cart

Active Member
Location: Beijing Beijing China
Address: Room 1907, Jincheng Center, Tongzhou, Beijing, China 101100
Supplier`s last login times: within 47 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details
Q235B Steel Box Girder Segment Formwork Precast Concrete Forms Molds short recycle time for bridge project
PRODUCT DESCRIPTION

Advantages and Benefits

1. Construction Simplicity
• easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/ good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and repaired if required.
• maintenance program can be scheduled.


Key componets

1. Casting Yard and Segment Production
(Geometry Control Program and Software)
2. Segment Erection/ Installation and Equipments


Segment casting yard components

1. Short-Line Match Casting and Casting Mould Units
2. Production and Working Space
• Rebar Assembly
• Prestressing Work
• Segment Touch-up/ Repair
• Ready-mixed Concrete Plant
3. Lifting Equipments
4. Storage Area

All-in-one solution

Professional solution for each project

Prompt offer with competitive price

Process every unique project for client


Formwork instructors

The Boyoun formwork in­struc­tors are spe­cial­ly trained and ex­pe­ri­enced prac­ti­tion­ers who know how to install


FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city. And we have 10 processing base in China.

2. How fast can my order be delivered?

You can state your desired Delivery date for your order. The order and the desired delivery date will be checked after your order got sent.
When you receive your order confirmation, you will find the information on your final delivery date (outgoing). We will, of course, try our best to meet the specified delivery date.

3. What's the material of your products?

Steel Q235B or Q345B. We can fabricate the GB and ASTM standard production.

China Bridge Project Box Girder Formwork Precast Concrete Forms Molds Short Recycle Time supplier

Bridge Project Box Girder Formwork Precast Concrete Forms Molds Short Recycle Time

Inquiry Cart 0