Hydraulic Vibro Hammer For 10 Meter Sheet Pile Driving Construction Projects

Brand Name:VIBRA
Certification:ISO 9001:2015
Model Number:FV-250
Minimum Order Quantity:1 set
Delivery Time:7-35 days
Payment Terms:L/C, T/T, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.3652, Cao'an Road, Jiading district, Shanghai
Supplier`s last login times: within 45 hours
Product Details Company Profile
Product Details

Vibro hammer for 10 meter sheet pile driving construction projects


Larsen steel sheet pile retaining always the first choose! Whether construction, irrigation, sewage treatment, and now floods, strong Larsen steel sheet pile can be perseverance does not fall in the water! And do Larsen steel sheet pile cofferdam is environmentally friendly construction speed, low construction costs, time-sensitive!


Features

  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Quick converting operation; Applied to various working environments.
  • Compared to other systems, less force required for pile pulling
  • Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • Not damage the building even often work near it.
  • Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short;It is helpful to overcome environmental problems.
  • According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
  • Hydraulic motor has small volume and light weight, but it can output high power and high speed.
  • Vibration frequency can be adjusted by variable pump. It can be used in excavator operation of any brand, and can meet different work requirements only after changing chucks.

Working Principle


Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.


Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

Technical Parameter


ItemFV-250FV-280FV-300FV-330FV-350LFV-350FV-400
Vibration Frequency (rpm)2500280032003200320032003200
Operation Pressure (Mpa)30323232323232
Centrifugal Force (KN)265335350372435455485
Max.Pile Length (m)10121212151518
Arm Weight (kg)500500670670670750750
Hammer Weight (kg)1700190021002300240026002700
Excavator (T)20-3020-3030-3533-4035-4040-4545-60

FAQ


Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.


Q: What is the MOQ?

A: One set is available.


Q: What's the payment method?

A: We accept L/C, T/T and D/P payment.


Q: What is the delivery time?

A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.


Q: Can I have our LOGO on the machine?

A: Of course you can.


Q: How is your product quality?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".


Q: Can I be your dealer?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

China Hydraulic Vibro Hammer For 10 Meter Sheet Pile Driving Construction Projects supplier

Hydraulic Vibro Hammer For 10 Meter Sheet Pile Driving Construction Projects

Inquiry Cart 0