Heavy Weight Hydraulic Vibratory Hammer For Long Sheet Pile Driving Projects

Brand Name:VIBRA
Certification:ISO 9001:2015
Model Number:FV-400
Minimum Order Quantity:1 set
Delivery Time:7-35 days
Payment Terms:T/T, D/P, Western Union, MoneyGram, L/C, D/A
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.3652, Cao'an Road, Jiading district, Shanghai
Supplier`s last login times: within 45 hours
Product Details Company Profile
Product Details

High strength heavy weight hydraulic vibratory hammer for long sheet pile driving projects


Fine-grained soils can be an issue for a few vibratory hammers. Our hydraulic vibrating hammers are particularly viable at driving piles into sediment, mud, or different kinds of conditions. We've designed our vibratory drivers/extractors to be the absolute hardest-working pieces of equipment in the industry. Strength and usability join to furnish you with the quickest method for driving or concentrate different pile materials with a negligible exertion. Our all-steel gear boxes are scrutinized after creation to guarantee that all welds are strong and trustworthy. Keeping vibrations limited assists with keeping up with the unrivaled nature of our vibratory drivers, as well as downplaying percussion hands on location. The core of our vibrating hammer should be dependable and intense, that is why we utilize excellent compound steel to guarantee unrivaled tooth strength and life span. We have an excellent relationship with Zoomlion excavator, it’s helps us to understand the excavator more and make it easy to install with any models of Zoomlion. Two sets of FV400 are fitted with Zoomlion ZE550EK-10 models respectively with the goal of driving 15 meter or even more!


Working Principle


Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.


Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

Technical Parameter


ItemFV-250FV-280FV-300FV-330FV-350LFV-350FV-400
Vibration Frequency (rpm)2500280032003200320032003200
Operation Pressure (Mpa)30323232323232
Centrifugal Force (KN)265335350372435455485
Max.Pile Length (m)10121212151518
Arm Weight (kg)500500670670670750750
Hammer Weight (kg)1700190021002300240026002700
Excavator (T)20-3020-3030-3533-4035-4040-4545-60

FAQ


Q: Are you a manufacturer?


A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,


Q: Who is your main customer?


A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.


Q: How long is the warranty period ?


A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.


Q: What is the MOQ ?


A: 1 set is available.


Q: What's the payment method ?


A: We accept T/T and D/P payment.


Q: What is the delivery time ?


A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.


Q: Can I have our LOGO on the machine ?


A: Of course you can.


Q: How is your product quality ?


A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".


Q: Can I be your dealer ?


A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

China Heavy Weight Hydraulic Vibratory Hammer For Long Sheet Pile Driving Projects supplier

Heavy Weight Hydraulic Vibratory Hammer For Long Sheet Pile Driving Projects

Inquiry Cart 0