

Add to Cart
Technical Parameter
Item | FV-100 | FV-150 |
Vibration Frequency (rpm) | 2500 | 2800 |
Operation Pressure (Mpa) | 30 | 32 |
Centrifugal Force (KN) | 117 | 172 |
Max.Pile Length (m) | 6 | 8 |
Arm Weight (kg) | 160 | 260 |
Hammer Weight (kg) | 850 | 1100 |
Excavator (T) | 7-12 | 12-17 |
Description
Mini hydraulic pile driver is a unique product of our company. Its
birth has filled in the industry gap: changed the history that
small excavators cannot be refitted; solved the problem that small
pile foundation cannot be mechanized construction.
This series of machines have made due contributions to the
foundation construction of new rural reconstruction.
Equipment Advantage
1, Mini structure type.light weight with maximum vibrate momend.
2, The latest fourth generation with optimized structure and
enhance performance stability.
3, Flexible in limited operation space, such asnarrow watercourse
and private house foundation with various type pile, like steel
pile concrete pile and wood pile.
About Us
Shanghai Yekun Construction Machinery Co., Ltd. was founded in
2014, A professional company involving in hydraulic vibrating pile
driver manufacture, sale and service. Our company take the latest
high speed hydraulic vibrating pile driver and its components as
the main products. Our products vastly apply for infrastructure
& construction industries.
We focus on product quality with the latest industrial technology.
The mini hydraulic vibrating pile driver lead the industrial trend.
The middle and large hydraulic vibrating pile driver also are
highly recognized by our clients. At the same time, we actively
cooperated with the engineering machinery factory and construction
company to jointly develop more functional professional equipment,
and we hired foreign professionals as our technical adviser.
Our company is consisting of a young, enthusiasm professional team.
Adhere to client as priority, Quality as first concern, Management
as foundation. We are working for the direction to become the most
professional and comprehensive hydraulic vibrating pile driver
manufacture and service supplier.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of
installation, the mainframe and key components, except for wearing
parts.
Q: What is the MOQ?
A: One set is available.
Q: What's the payment method?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 1-8 days, and arrive at Shanghai
Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the
technical standards of "Technical Conditions for Pile Driver
Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to
further developing into a regional general agent and strategic
partner like you with lofty ideals!