7.5kw Double Layer Roll Forming Machine GI PPGI 25m/ Min Anti Rusty

Brand Name:FMS
Certification:CE,ISO
Model Number:840-850
Minimum Order Quantity:1 set
Delivery Time:30days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Cangzhou Hebei China
Address: ROOM 703, Yihe Building, Cangzhou City, Hebei province,China
Supplier`s last login times: within 15 hours
Product Details Company Profile
Product Details

7.5kw Double Layer Roll Forming Machine GI PPGI 25m/ Min Anti Rusty

7.5kw Double Layer Roll Forming Machine GI PPGI 25m/ Min Anti Rusty :Decoiler--Feeding--Roll Forming--Cutting--Output Table

Decoiler

Capacity: 5000kg

Width: 1250mm

Type: Hydraulic Or Manual (Optional)

Inner Diameter: 450-550mm

Outter Diameter: 1500mm

Roll Forming Machine

Power: 3kw

Frame panel thickness: 14mm

Bottom Frame: 360H steel

Weight: 5t

Cutting Device

Type: Hydraulic

Driven; 1 inch chain

Power; 3kw

Cutting Blade: Cr12 steel

Hardness for Heat Treatment:HRC55 – 60°

Hydraulic Pump

Power: 3kw

Oil Type: 46# hydraulic oil

Pump Brand: China Brand

Control System

Type: PLC Frequency Control System with touch screen
PLC Brand:Delta
Encoder Brand: Omron

Length Error: ±2mm

Language: English and Chinese

Output Table

Length: 6m

It is simple and used to load finished product.



Detailed Parameters:

Shaft MaterialNo.45 steel with treatment
Roller Station

up 16 steps

down 18 steps

Main Shaft Dimension70mm
Material Thickness0.3-0.8mm
Roller MaterialNo.45 steel with treatment
Working Speed8-12m/min
MaterialPPGI/GI

Guarantee


1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation


Payment terms


40% in advance as down payment

60% is paid before the shipment is processed


Delivery


FOB: Tianjin Xingang Port

The Delivery Time: 30 days after the down payment is received.



China 7.5kw Double Layer Roll Forming Machine GI PPGI 25m/ Min Anti Rusty supplier

7.5kw Double Layer Roll Forming Machine GI PPGI 25m/ Min Anti Rusty

Inquiry Cart 0