Add to Cart
Metal Roofing Downpipe Making Machinery Roll Forming Machine Rainwater Downspout
Metal Roofing Downpipe Making Machinery Roll Forming Machine
Rainwater Downspout Advantage of steel :
Galvanized steel guttering resists thermal expansiono and
contraction,which means that it remains unaffected from sudden
fluctuations in temperature.Steel has an excellent lifetime
value,as it can be recycled.
The downpipe forming machine we produced is customized according to
the specific requirements of customers.Such as specification and
raw materials, The machine is intalled and tested before leaving
the factory.
After receiving the machine, the customer can start production once
connect wires and tubes.We randomly send instructions to tell how
to operate. Of course, we also have corresponding videos for
reference.
Technicians Can also be sent to customer factory for guidance and
training if necessary.
The downpipe roll forming machine also work with elbow bending
machine,
which make flat pipe to curve according to construction requirement.
Specification
No. | Item | Description |
1 | Coil | PPGI |
2 | Loading weight | 3T |
3 | Thickness of Material | 0.4-0.6mm |
4 | Roller Station | 26 Stations |
5 | Dimension (L*W*H) | 8000 mm*800 mm*1200 mm |
6 | Forming Speed | 10-15m/min |
7 | Electrical Control System | PLC |
8 | Diameter of Shaft | ¢70mm |
9 | Main Power | 7.5KW |
10 | Power Supply | 380V, 60HZ, 3 PHASES(can be customized) |
11 | Cutting Accuracy | ± 2 mm |
12 | Hydraulic Power | 7.5KW |
13 | Material of cutter blade | Cr12 steel with quenched treatment |
Installation
During the installation and adjustment of the equipment, our
engineers shall provide the training to the buyer’s personal
request to operate and maintain the equipment. Including foundation
construction, electrical works, hydraulic oil, safe operation, and
non-standard safety items, testing material and etc.
Guarantee
The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during the guarantee period, we will provide the parts free of charge, which is in the conditions of correct operation. (Natural disasters or factors which can’t be forced by human are excluded).
Payment terms
40% in advance
60% is paid before shipping