Yx120-85 3 Phases Down Pipe Roll Forming Machine For Profile

Brand Name:CANGZHOU Famous
Certification:ISO CE
Model Number:Downspout
Minimum Order Quantity:1 Set
Delivery Time:30 Working Days
Payment Terms:L/C, T/T, D/A, D/P
Contact Now

Add to Cart

Verified Supplier
Location: Cangzhou Hebei China
Address: ROOM 703, Yihe Building, Cangzhou City, Hebei province,China
Supplier`s last login times: within 15 hours
Product Details Company Profile
Product Details

Rain Water Steel Down Pipe Roll Forming Machine Downpipe Making Machine

Closed type colour coated steel downpipe is cold rolled and automatically edge interlocked by WLDP series downpipe roll forming machine, the finished products are of many features, such as good interlocking, beautiful integrity, lomg time using and so on . This series machine is matched with downpipe bending machine, used for bending and end narrowing . The angle of bending can be adjusted by manual according to engineering requirements.

The application of the downspout makes the steel building stronger, and there are many elbows that match the water drop pipe. The more complex wall surface is also suitable.

steel downspout pipe will not cause aging as thermal expansion and contraction, cracks, so it is more durable

Specification

The general machine parameter
Suitable roll forming materialColor steel sheet or galvanized steel sheet
Thickness0.4-0.6mm
Frame designWall-plate-frame-design /Strong-stand-frame-design
Roll stages16 stages
Material of forming roller45# steel with forge treatment, CNC lathes, Hard Chrome Coated
Shafts DiameterΦ75mm
Main motor power5.5KW
Max. Line speed of roll former12-15m/min (Higher speed is available, depends on the specification required by the buyer)
Hydraulic group power3 KW
Material of cutting bladeCr12, heat treatment
Electric Standard380V /50Hz/3PH or as the customer's requirements
Machine Dimensions9500mm×1200mm×1400mm
Major Color of Machine PaintedRAL 5015 (Blue)or as per customer's requirements

Guarantee


1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation


Payment terms


40% in advance as down payment

60% is paid before the shipment is processed


Delivery


FOB: Tianjin Xingang Port

The Delivery Time: 30 days after the down payment is received.


China Yx120-85 3 Phases Down Pipe Roll Forming Machine For Profile supplier

Yx120-85 3 Phases Down Pipe Roll Forming Machine For Profile

Inquiry Cart 0