ASME 2.45MPa Horizontal Water Tube Waste Heat Boiler

Brand Name:Kaineng
Certification:ISO ASME
Model Number:KNFT-1
Minimum Order Quantity:1 Set
Delivery Time:60 Working Days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Qingdao Guizhou China
Address: No.3, Guizhou Branch Road, Beiguan Industrial Park, Jiaozhou City, Qingdao, Shandong Province, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details
Horizontal Water Tube Generator Set Waste Heat Boiler for Oil/Natura Gas Engines

Description of Water Tube Generator Set Waste Heat Boiler :
Water tube waste heat steam boiler: is the high efficient energy saving equipment for flue gas waste heat recovery of Diesel/HFo/Natural Gas Engines.

It is a special high-efficiency energy-saving product for specially designed for the waste heat recovery of the flue gas of the generator set. H fin tubes are used to increase the boiler heating surface on the smoke side of the water tube.


At present, thousands of waste heat boilers have been applied to various types of gas-fired generating units, which have been highly praised by users.

Design Structure Of Water Tube Generator Set Waste Heat Boiler:
Waste Heat Steam Boiler:
1. Superheater
2. Evaporator
3. Economizer (heating the feedwater)
Product advantage of Water Tube Generator Set Waste Heat Boiler:
1High heat transfer efficiency.
The welding fusion rate of fins with steel pipes can reach up to 95%. low contact resistance, good heat transfer performance.
2Low flow resistance
3Less dust
4Less wear and tear
5Small size and light weight
Product parameter Of Water Tube Generator Set Waste Heat Boiler (Boiler customization available):
Operating pressure:1.0MPa
Design pressure:1.1MPa
Operating temperature(inlet/outlet) ºC60/184ºC
Design temperature200ºC
Hydraulic test pressure1.4MPa
Maximum dimension:2885×Φ1525 (mm)

More Other Waste Heat Boiler Projects:
Kaineng Service Provided:
Pre-sale service:
Kaineng helps customer to choose the proper waste heat boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.

In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.

After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
Waste Heat Boiler Package &Transporation:
Kaineng Factory Area
China ASME 2.45MPa Horizontal Water Tube Waste Heat Boiler supplier

ASME 2.45MPa Horizontal Water Tube Waste Heat Boiler

Inquiry Cart 0