Model | 2000 | 3000 | 4000 | 6000 |
Discharge capacity (t/batch) | 1-1.5t/batch | 2-2.5t/batch | 3-3.5t/batch | 4-4.54t/batch |
Mixer cylinder volume(m3) | 2 | 3 | 4 | 6 |
Mixing time | 3-5min | 3-5min | 3-5min | 3-5min |
Motor power | 18.5kw | 22kw | 37kw | 37kw |
Shaft rotate speed | 43r/min | 43r/min | 43r/min | 43r/min |
Coefficient of variation(CV) | <=5% | <=5% | <=5% | <=5% |
Paddle blade quantity | 2*14=28pcs | 2*14=28pcs | 2*14=28pcs | 2*14=28pcs |
Overall dis(mm) | 2600*1600*1650 | 3000*1600*1650 | 3000**2200*2000 | 3000*2450*2200 |
Twin Shaft Agravic cylinder mixer cylinder engine is equipped with a biaxial folding cylinder, and the polymer shakes the material around the container and the perimeter. Fully applying the principles of convective coherence, the materials in the machines are constantly discarding and forming a layer of sediment, they may lose weight immediately at the same average velocity so that the best effect can be achieved, as well as the speed of violent change slows down the mixing time. to a very large extent. The machine is widely applied to infinite production line tools.
1. Horizontal installation, ensuring that the valve is opening, the handle and connecting rod is flexible.
2. After positioning of the reducer, tension the chain and install
the safe cover.
3. Equipped with boot settings, which can connect the air source
with the air cylinder.Use solenoid valve to control.The air
pressure should guarantee 0.6Mpa. pressure according to the
requirement of the air cylinder.
4. Install the control cabinet according to the requirement of the
production line. Use AC contactor to control the circuit.
5. Confirm the rotating direction of the main axis,the chain wheel
and the scutcheon arrow.Ensure that the chain aims the position of
two main axis.The installation of the body and the transmission
device refers to the outside view.Move the reducer to tension the
chain. Move with hands and pay attention to the infall of the left
and right main axis to make sure there is no friction.
6. Add engine oil for the reducer, chain and bearing.
7. The requirement of trial run: Maintain the empty machine
operates 3 hours after energizing. Check the bearing block
temperature of the two main axis. Make sure that no noise in the
machine and the scutcheon arrow of the chain wheel point to the
same direction.
1) How to get the most suitable machine and best price?
A: Please tell the material you want to working on.
2) How to working on it ?
A: What’s the MAX size of these material ?
3) Do you have the manual of machine ?
A: Yes,packing with machine together ship for you.
4) If we donot know how to use the machine, can you teach us?
A: Yes,we will ,if you come to China,we will offer you free
training until you can use machine freely.And if you are busy ,we
will have the special engineer to your country,but you need to bear
some fee,like tickets and hotel and meal.
5) How about your after-sales service?
A: We offer you 24 hours service phone,skype or whatsapp.